Padstake
Menu

Norfolk, VA

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
Nonerank by 2025 new single-family permits

Impact fees verified. Not a full total. Impact/connection fees verified from the Norfolk Utilities schedule (effective 7/1/2026) and its HRSD facility charge table (FY26, effective 07/01/2025; an FY27 HRSD table may exist and was not found). Included: new water service line with meter ($525), sewer connection ($250), HRSD facility charge for a 3/4-inch meter ($4,275; 5/8-inch is $2,745). Missing: residential building permit fee schedule (the city residential permit application lists no amounts; valuation-based fees not located), land disturbance permit and Chesapeake Bay review for single family ($180 and $220 per planning fee schedule src 1327 effective July 1 2024), so no total. Searched 2026-11-09 (lane A).

Water/sewer provider: City of Norfolk

LinePrinted ratePrototypeReceipt
Water connection: new service line with meter, 5/8-inch or 3/4-inch
water
$525.00
per connection, by meter size
$525Printed (meter only $125.00)
Effective 2026-07-01
Source · Norfolk Department of Utilities Water and Sanitary Sewer Connection Fees (effective 7/1/2026), Water Connection Fees
fetched 2026-11-09, sha256 ceeec54a60d8
Sanitary sewer connection to existing lateral at property line
sewer
$250.00
per connection
$250Printed
Effective 2026-07-01
Source · Norfolk Department of Utilities Water and Sanitary Sewer Connection Fees (effective 7/1/2026), Sanitary Sewer Connection Fees
fetched 2026-11-09, sha256 ceeec54a60d8
Hampton Roads Sanitary District (HRSD) facility charge, 3/4-inch meter (5/8-inch: $2,745.00)
sewer · computed
$4,275.00
per meter, by size
$4,275Printed (FY26, effective 07/01/2025; higher of 5/8-inch and 3/4-inch)
Effective 2025-07-01
Source · Norfolk Department of Utilities Water and Sanitary Sewer Connection Fees (effective 7/1/2026), HRSD Facility Charges
fetched 2026-11-09, sha256 ceeec54a60d8

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.