New Kent County, VA
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. New Kent County public utilities fees effective July 1, 2026 for a 5/8-inch meter: water and sewer connection fees, both availability fees, meter installation and the $50 admin fee. The page says fees may vary by service location and some subdivisions are prepaid or waived. Virginia has no impact fee. NOT included: utility deposit ($50-$150, refundable), building permit fees (no posted schedule found), proffers. Page never shows a total. 2026-11-09.
Water/sewer provider:
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water connection fee, 5/8 inch water | 4836.00 per 5/8 inch meter | $4,836 | Printed Effective 2026-07-01 Source · New Kent Utility Rates & Fees, Public Utilities Fees (effective July 1, 2026) fetched 2026-11-09, sha256 037207918ce1 |
| Water connection availability fee, 5/8 inch water | 2600.00 per 5/8 inch meter | $2,600 | Printed Effective 2026-07-01 Source · New Kent Utility Rates & Fees, Public Utilities Fees (effective July 1, 2026) fetched 2026-11-09, sha256 037207918ce1 |
| Sewer connection fee, 5/8 inch sewer | 9646.00 per 5/8 inch meter | $9,646 | Printed Effective 2026-07-01 Source · New Kent Utility Rates & Fees, Public Utilities Fees (effective July 1, 2026) fetched 2026-11-09, sha256 037207918ce1 |
| Sewer connection availability fee, 5/8 inch sewer | 2600.00 per 5/8 inch meter | $2,600 | Printed Effective 2026-07-01 Source · New Kent Utility Rates & Fees, Public Utilities Fees (effective July 1, 2026) fetched 2026-11-09, sha256 037207918ce1 |
| Water meter installation fee, 5/8 inch water | 420.00 per 5/8 inch meter | $420 | Printed Effective 2026-07-01 Source · New Kent Utility Rates & Fees, Public Utilities Fees (effective July 1, 2026) fetched 2026-11-09, sha256 037207918ce1 |
| Administrative fee water | 50 per 5/8 inch meter | $50 | Printed Effective 2026-07-01 Source · New Kent Utility Rates & Fees, Public Utilities Fees (effective July 1, 2026) fetched 2026-11-09, sha256 037207918ce1 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.