Goochland County, VA
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. Goochland County FY26 (effective July 1, 2025) water connection fee $5,100 and sanitary sewer connection fee $7,200 per single-family dwelling; FY27 sheet not found. Virginia has no impact fee. NOT included: building permit (residential value formula posted, rev 1/19/2024, but the trade-permit value basis is ambiguous so not computed), zoning, stormwater, plan fees, meter. Page never shows a total. 2026-11-09.
Water/sewer provider:
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water connection fee, single-family dwelling water | $5,100.00 per dwelling unit single-family dwellings, including semi-detached | $5,100 | Printed Effective 2025-07-01 Source · Goochland FY26 Connection Fees, Water Connection Fees (effective July 1, 2025) fetched 2026-11-09, sha256 2c911ab015f8 |
| Sanitary sewer connection fee, single-family dwelling sewer | $7,200.00 per dwelling unit single-family dwellings, including semi-detached | $7,200 | Printed Effective 2025-07-01 Source · Goochland FY26 Connection Fees, Sanitary Sewer Connection Fees (effective July 1, 2025) fetched 2026-11-09, sha256 2c911ab015f8 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.