Chesterfield County, VA
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. Chesterfield County: FY27 utility capital cost recovery charges (water $6,642, wastewater $5,954), 5/8-inch meter and service line installation, and FY27 residential new single-family building ($684), electrical ($171) and plumbing ($228) permits with the 2% state levy. Virginia has no impact fee. NOT included: new single-family mechanical permit, Environmental Engineering site inspection / VSMP stormwater fees, Planning Department fee (amounts on the sheet but their labels did not map reliably), fire/boiler permits ($57 each), parcels on private septic/well. Page never shows a total. 2026-11-09.
Water/sewer provider:
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water recovery charge (capital cost recovery), single-family, 5/8 inch water | $6,642 per dwelling, 5/8 inch meter (1.00 ERU) | $6,642 | Printed Effective 2026-07-01 Source · Chesterfield County Utilities Rates and Fees (effective with bills issued on and after July 1, 2026), Capital Cost Recovery Charge fetched 2026-11-09, sha256 87b54dc1a8c5 |
| Wastewater recovery charge (capital cost recovery), single-family, 5/8 inch sewer | $5,954 per dwelling, 5/8 inch meter (1.00 ERU) | $5,954 | Printed Effective 2026-07-01 Source · Chesterfield County Utilities Rates and Fees (effective with bills issued on and after July 1, 2026), Capital Cost Recovery Charge fetched 2026-11-09, sha256 87b54dc1a8c5 |
| Water service installation - meter charge, 5/8 inch water | $250 per 5/8 inch meter | $250 | Printed Effective 2026-07-01 Source · Chesterfield County Utilities Rates and Fees (effective with bills issued on and after July 1, 2026), Water Service Installation Charges fetched 2026-11-09, sha256 87b54dc1a8c5 |
| Water service installation - service line charge, 5/8 inch water | $3,900 per 5/8 inch service line | $3,900 | Printed Effective 2026-07-01 Source · Chesterfield County Utilities Rates and Fees (effective with bills issued on and after July 1, 2026), Water Service Installation Charges fetched 2026-11-09, sha256 87b54dc1a8c5 |
| Building permit, new construction single family dwelling permit | 684.00 per dwelling | $684 | Printed Effective 2026-07-01 Source · Chesterfield County Residential Fee Schedule Summary 7/1/2026 - 6/30/2027 fetched 2026-11-09, sha256 d7d2501de5ce |
| Electrical permit, new single family dwelling permit | 171.00 per dwelling | $171 | Printed Effective 2026-07-01 Source · Chesterfield County Residential Fee Schedule Summary 7/1/2026 - 6/30/2027, Electrical Permits fetched 2026-11-09, sha256 d7d2501de5ce |
| Plumbing permit, new single family dwelling permit | 228.00 per dwelling | $228 | Printed Effective 2026-07-01 Source · Chesterfield County Residential Fee Schedule Summary 7/1/2026 - 6/30/2027, Plumbing Permits fetched 2026-11-09, sha256 d7d2501de5ce |
| State levy (2%) on building inspection fees permit · computed | 2.00% percent of building inspection fees | $21.66 | 2% x (684 + 171 + 228) = 21.66 Effective 2026-07-01 Source · Chesterfield County Residential Fee Schedule Summary 7/1/2026 - 6/30/2027, State Levy fetched 2026-11-09, sha256 d7d2501de5ce |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.