Padstake
Menu

Chesterfield County, VA

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
Nonerank by 2025 new single-family permits

Impact fees verified. Not a full total. Chesterfield County: FY27 utility capital cost recovery charges (water $6,642, wastewater $5,954), 5/8-inch meter and service line installation, and FY27 residential new single-family building ($684), electrical ($171) and plumbing ($228) permits with the 2% state levy. Virginia has no impact fee. NOT included: new single-family mechanical permit, Environmental Engineering site inspection / VSMP stormwater fees, Planning Department fee (amounts on the sheet but their labels did not map reliably), fire/boiler permits ($57 each), parcels on private septic/well. Page never shows a total. 2026-11-09.

Water/sewer provider:

LinePrinted ratePrototypeReceipt
Water recovery charge (capital cost recovery), single-family, 5/8 inch
water
$6,642
per dwelling, 5/8 inch meter (1.00 ERU)
$6,642Printed
Effective 2026-07-01
Source · Chesterfield County Utilities Rates and Fees (effective with bills issued on and after July 1, 2026), Capital Cost Recovery Charge
fetched 2026-11-09, sha256 87b54dc1a8c5
Wastewater recovery charge (capital cost recovery), single-family, 5/8 inch
sewer
$5,954
per dwelling, 5/8 inch meter (1.00 ERU)
$5,954Printed
Effective 2026-07-01
Source · Chesterfield County Utilities Rates and Fees (effective with bills issued on and after July 1, 2026), Capital Cost Recovery Charge
fetched 2026-11-09, sha256 87b54dc1a8c5
Water service installation - meter charge, 5/8 inch
water
$250
per 5/8 inch meter
$250Printed
Effective 2026-07-01
Source · Chesterfield County Utilities Rates and Fees (effective with bills issued on and after July 1, 2026), Water Service Installation Charges
fetched 2026-11-09, sha256 87b54dc1a8c5
Water service installation - service line charge, 5/8 inch
water
$3,900
per 5/8 inch service line
$3,900Printed
Effective 2026-07-01
Source · Chesterfield County Utilities Rates and Fees (effective with bills issued on and after July 1, 2026), Water Service Installation Charges
fetched 2026-11-09, sha256 87b54dc1a8c5
Building permit, new construction single family dwelling
permit
684.00
per dwelling
$684Printed
Effective 2026-07-01
Source · Chesterfield County Residential Fee Schedule Summary 7/1/2026 - 6/30/2027
fetched 2026-11-09, sha256 d7d2501de5ce
Electrical permit, new single family dwelling
permit
171.00
per dwelling
$171Printed
Effective 2026-07-01
Source · Chesterfield County Residential Fee Schedule Summary 7/1/2026 - 6/30/2027, Electrical Permits
fetched 2026-11-09, sha256 d7d2501de5ce
Plumbing permit, new single family dwelling
permit
228.00
per dwelling
$228Printed
Effective 2026-07-01
Source · Chesterfield County Residential Fee Schedule Summary 7/1/2026 - 6/30/2027, Plumbing Permits
fetched 2026-11-09, sha256 d7d2501de5ce
State levy (2%) on building inspection fees
permit · computed
2.00%
percent of building inspection fees
$21.662% x (684 + 171 + 228) = 21.66
Effective 2026-07-01
Source · Chesterfield County Residential Fee Schedule Summary 7/1/2026 - 6/30/2027, State Levy
fetched 2026-11-09, sha256 d7d2501de5ce

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.