South Jordan, UT
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: Included: the city water (3/4-inch meter), storm water, park, transportation and public safety impact fees from the city Combined Impact Fee Schedule updated 10/23/25.Included also: JBID Service Area No. 1 sewer impact fee $6,637.31 (src 659; area assignment of the parcel not determined). Missing: other sewer connection charges (JBID fee page src 334 lists monthly rates only); water connection/meter charge (not in the city FY2026-27 fee schedule, src 328; the schedule says impact fees are not included). Included also: the city flat building permit for a single-family detached home valued $0-$500,000 ($3,877; $4,885 above; src 328). Checked 2026-11-09.
Water/sewer provider: City of South Jordan (water); Jordan Basin Improvement District (sewer)
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water impact fee, 3/4-inch meter water | $3,107.68 per 3/4-inch meter (Ord. 2018-03) | $3,107.68 | Printed Effective 2025-10-23 Source · South Jordan Combined City Impact Fee Schedule (updated 10/23/25), Water Impact Fee fetched 2026-11-08, sha256 aa2fe4a316f3 |
| Storm water impact fee, Res/A-1 and A-5 lots stormwater | $1,873.00 per lot by zone (Ord. 2015-18) | $1,873 | Printed; highest printed zone (A-1/A-5); R-1.8 $981, R-2.5 $804, R-3 $675 Effective 2025-10-23 Source · South Jordan Combined City Impact Fee Schedule (updated 10/23/25), Storm Water Impact Fee fetched 2026-11-08, sha256 aa2fe4a316f3 |
| Park impact fee, single-family parks | $6,552.00 per household (Ord. 2025-12) | $6,552 | Printed Effective 2025-10-23 Source · South Jordan Combined City Impact Fee Schedule (updated 10/23/25), Park Impact Fee fetched 2026-11-08, sha256 aa2fe4a316f3 |
| Transportation impact fee, single-family residential transportation | $3,403.10 per unit (Ord. 2024-15) | $3,403.10 | Printed; South Jordan proper rate, Daybreak adjusted fee is $705.17 Effective 2025-10-23 Source · South Jordan Combined City Impact Fee Schedule (updated 10/23/25), Transportation Impact Fee fetched 2026-11-08, sha256 aa2fe4a316f3 |
| Public safety impact fee (fire/EMS $734 + police $205), single-family public_safety | $939.00 per unit (Ord. 2024-05) | $939 | Printed combined fee Effective 2025-10-23 Source · South Jordan Combined City Impact Fee Schedule (updated 10/23/25), Public Safety Impact Fee fetched 2026-11-08, sha256 aa2fe4a316f3 |
| Jordan Basin Improvement District sewer impact fee, single family (Service Area No. 1) sewer | $6,637.31 per unit (effective March 1, 2026) | $6,637.31 | Printed; Table 6 of the JBID Sewer Impact Fee Analysis adopted by Resolution 11-25-2025-04; South Jordan parcels may fall in Service Area 1 or 3, parcel not determined Effective 2025-10-23 Source · JBID Sewer Impact Fee Analysis Nov 2025, Table 6 Impact Fee by Land Use Type fetched 2026-11-09, sha256 d7cd4e0fa703 |
| Building permit, single family detached (PRSFD), valuation $0-$500,000 permit | $3,877 flat for single family detached valued $0-$500,000 ($4,885 above $500,001) | $3,877 | Printed; valuation $380,268 (Padstake standard) falls in the $0-$500,000 band; the schedule does not say whether plan review is included Effective 2025-10-23 Source · City of South Jordan City Fee Schedule FY2026-2027, Building & Engineering Fees fetched 2026-11-09, sha256 db0d90b672bb |
| Total listed | $26,389.09 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.