Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$22,003.44listed total
Nonerank by 2025 new single-family permits

Not included: Included: valuation permit (city values at 75% of ICC BVD) with 65% plan review and 1% state training fee, single-family meter connection $600, and the drinking water, fire flow, city sewer, Timpanogos SSD sewer, parks, public safety, transportation and storm drain impact fees from the FY 2025-26 summary updated 3/2/2026. Not included: secondary (pressurized irrigation) water connection $41,694 per irrigable acre (an ERC is about 0.24 irrigable acres, depends on the lot), water rights/source costs paid at plat recordation (0.30 acre-feet per unit; CUWCD $5,482.20 per ERC; secondary water $3,514 per acre-foot), application submittal fee $200 (credited to the permit fee), electrical/plumbing/mechanical permits as separate schedules, escrow bonds. The permit schedule linked by the city is the 2012 Seattle Residential Code Appendix L table; the 2025-26 column of the consolidated schedule says only "as per fee schedule found in the International Residential Code".

Water/sewer provider: City of Saratoga Springs (water, sewer); Timpanogos Special Service District (regional sewer)

LinePrinted ratePrototypeReceipt
Building permit (valuation-based, IRC Appendix L schedule)
permit · computed
$1,027 for the first $100,000; plus $7 for each additional $1,000 or fraction thereof, up to and including $500,000
percent of valuation
$2,329City values at 75% of ICC BVD: 75% x $380,268 (ICC BVD R-3 V-B 175.92 x 2,000 + U V-B 71.07 x 400) = $285,201; 186 additional $1,000 units x 7 + 1,027 = 2,329.00
Effective 2026-03-02
Source · Building permit fee schedule linked from city page (IRC Appendix L Permit Fees)
fetched 2026-11-09, sha256 db514a9ab09e
Plan review
permit · computed
65% of the building permit fee
percent of permit fee
$1,513.8565% x 2,329.00 = 1,513.85
Effective 2026-03-02
Source · Consolidated Fee Schedule, Building: Other Inspections and Fees
fetched 2026-11-09, sha256 48ba557da7f3
State of Utah inspector training
permit · computed
1% of permit fee
percent of permit fee
$23.291% x 2,329.00 = 23.29
Effective 2026-03-02
Source · Consolidated Fee Schedule, Building
fetched 2026-11-09, sha256 48ba557da7f3
Meter connection, single-family residential meter
water
$600.00
per meter
$600Printed
Effective 2026-03-02
Source · Consolidated Fee Schedule, Utilities: Meter Connection Fees
fetched 2026-11-09, sha256 48ba557da7f3
Drinking water impact fee, 3/4-inch lateral (with well water rights credits)
water
$2,465
per single-family connection
$2,465Printed; highest printed column; $2,019 when bringing CUWCD water
Effective 2026-03-02
Source · Summary of Impact Fees for Residential Developments, FY 2025-2026, updated 3/2/2026
fetched 2026-11-09, sha256 04fe9e6e6e86
Fire flow impact fee (base)
water
$264
per connection, base fee
$264Printed; rises with project-specific fire flow requirements
Effective 2026-03-02
Source · Summary of Impact Fees for Residential Developments, FY 2025-2026, updated 3/2/2026
fetched 2026-11-09, sha256 04fe9e6e6e86
City sewer impact fee, 3/4-inch lateral
sewer
$1,489.55
per single-family connection
$1,489.55Printed
Effective 2026-03-02
Source · Summary of Impact Fees for Residential Developments, FY 2025-2026, updated 3/2/2026
fetched 2026-11-09, sha256 04fe9e6e6e86
Timpanogos Special Service District sewer impact fee, single-family
sewer
$5,793
per single-family unit
$5,793Printed
Effective 2026-03-02
Source · Summary of Impact Fees for Residential Developments, FY 2025-2026, updated 3/2/2026
fetched 2026-11-09, sha256 04fe9e6e6e86
Parks impact fee
parks
$5,627.14
per unit
$5,627.14Printed
Effective 2026-03-02
Source · Summary of Impact Fees for Residential Developments, FY 2025-2026, updated 3/2/2026
fetched 2026-11-09, sha256 04fe9e6e6e86
Public safety impact fee
public_safety
$467.21
per unit
$467.21Printed
Effective 2026-03-02
Source · Summary of Impact Fees for Residential Developments, FY 2025-2026, updated 3/2/2026
fetched 2026-11-09, sha256 04fe9e6e6e86
Transportation impact fee, single-family
transportation
$1,016
per unit
$1,016Printed
Effective 2026-03-02
Source · Summary of Impact Fees for Residential Developments, FY 2025-2026, updated 3/2/2026
fetched 2026-11-09, sha256 04fe9e6e6e86
Storm drain impact fee
stormwater · computed
$2,585 per gross acre
per gross acre
$415.40$2,585 x 7,000 / 43,560 sq ft per acre = 415.40 (7,000 sq ft lot assumed)
Effective 2026-03-02
Source · Summary of Impact Fees for Residential Developments, FY 2025-2026, updated 3/2/2026
fetched 2026-11-09, sha256 04fe9e6e6e86
Total listed$22,003.44

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.