Saratoga Springs, UT
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: Included: valuation permit (city values at 75% of ICC BVD) with 65% plan review and 1% state training fee, single-family meter connection $600, and the drinking water, fire flow, city sewer, Timpanogos SSD sewer, parks, public safety, transportation and storm drain impact fees from the FY 2025-26 summary updated 3/2/2026. Not included: secondary (pressurized irrigation) water connection $41,694 per irrigable acre (an ERC is about 0.24 irrigable acres, depends on the lot), water rights/source costs paid at plat recordation (0.30 acre-feet per unit; CUWCD $5,482.20 per ERC; secondary water $3,514 per acre-foot), application submittal fee $200 (credited to the permit fee), electrical/plumbing/mechanical permits as separate schedules, escrow bonds. The permit schedule linked by the city is the 2012 Seattle Residential Code Appendix L table; the 2025-26 column of the consolidated schedule says only "as per fee schedule found in the International Residential Code".
Water/sewer provider: City of Saratoga Springs (water, sewer); Timpanogos Special Service District (regional sewer)
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Building permit (valuation-based, IRC Appendix L schedule) permit · computed | $1,027 for the first $100,000; plus $7 for each additional $1,000 or fraction thereof, up to and including $500,000 percent of valuation | $2,329 | City values at 75% of ICC BVD: 75% x $380,268 (ICC BVD R-3 V-B 175.92 x 2,000 + U V-B 71.07 x 400) = $285,201; 186 additional $1,000 units x 7 + 1,027 = 2,329.00 Effective 2026-03-02 Source · Building permit fee schedule linked from city page (IRC Appendix L Permit Fees) fetched 2026-11-09, sha256 db514a9ab09e |
| Plan review permit · computed | 65% of the building permit fee percent of permit fee | $1,513.85 | 65% x 2,329.00 = 1,513.85 Effective 2026-03-02 Source · Consolidated Fee Schedule, Building: Other Inspections and Fees fetched 2026-11-09, sha256 48ba557da7f3 |
| State of Utah inspector training permit · computed | 1% of permit fee percent of permit fee | $23.29 | 1% x 2,329.00 = 23.29 Effective 2026-03-02 Source · Consolidated Fee Schedule, Building fetched 2026-11-09, sha256 48ba557da7f3 |
| Meter connection, single-family residential meter water | $600.00 per meter | $600 | Printed Effective 2026-03-02 Source · Consolidated Fee Schedule, Utilities: Meter Connection Fees fetched 2026-11-09, sha256 48ba557da7f3 |
| Drinking water impact fee, 3/4-inch lateral (with well water rights credits) water | $2,465 per single-family connection | $2,465 | Printed; highest printed column; $2,019 when bringing CUWCD water Effective 2026-03-02 Source · Summary of Impact Fees for Residential Developments, FY 2025-2026, updated 3/2/2026 fetched 2026-11-09, sha256 04fe9e6e6e86 |
| Fire flow impact fee (base) water | $264 per connection, base fee | $264 | Printed; rises with project-specific fire flow requirements Effective 2026-03-02 Source · Summary of Impact Fees for Residential Developments, FY 2025-2026, updated 3/2/2026 fetched 2026-11-09, sha256 04fe9e6e6e86 |
| City sewer impact fee, 3/4-inch lateral sewer | $1,489.55 per single-family connection | $1,489.55 | Printed Effective 2026-03-02 Source · Summary of Impact Fees for Residential Developments, FY 2025-2026, updated 3/2/2026 fetched 2026-11-09, sha256 04fe9e6e6e86 |
| Timpanogos Special Service District sewer impact fee, single-family sewer | $5,793 per single-family unit | $5,793 | Printed Effective 2026-03-02 Source · Summary of Impact Fees for Residential Developments, FY 2025-2026, updated 3/2/2026 fetched 2026-11-09, sha256 04fe9e6e6e86 |
| Parks impact fee parks | $5,627.14 per unit | $5,627.14 | Printed Effective 2026-03-02 Source · Summary of Impact Fees for Residential Developments, FY 2025-2026, updated 3/2/2026 fetched 2026-11-09, sha256 04fe9e6e6e86 |
| Public safety impact fee public_safety | $467.21 per unit | $467.21 | Printed Effective 2026-03-02 Source · Summary of Impact Fees for Residential Developments, FY 2025-2026, updated 3/2/2026 fetched 2026-11-09, sha256 04fe9e6e6e86 |
| Transportation impact fee, single-family transportation | $1,016 per unit | $1,016 | Printed Effective 2026-03-02 Source · Summary of Impact Fees for Residential Developments, FY 2025-2026, updated 3/2/2026 fetched 2026-11-09, sha256 04fe9e6e6e86 |
| Storm drain impact fee stormwater · computed | $2,585 per gross acre per gross acre | $415.40 | $2,585 x 7,000 / 43,560 sq ft per acre = 415.40 (7,000 sq ft lot assumed) Effective 2026-03-02 Source · Summary of Impact Fees for Residential Developments, FY 2025-2026, updated 3/2/2026 fetched 2026-11-09, sha256 04fe9e6e6e86 |
| Total listed | $22,003.44 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.