Padstake
Menu

Hurricane, UT

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
Nonerank by 2025 new single-family permits

Impact fees verified. Not a full total. IMPACT FEES ONLY and only the regional water district piece: Washington County Water Conservancy District impact fee for a residential 3/4 or 5/8-inch meter (district page read 2026-11-09; the 2026 district forms are dated 8/6/2026). No total is shown. Missing: all Hurricane City fees (cityofhurricane.com building, water, sewer, power, transportation, parks, storm drain impact fees and building permit schedule were not found on the city pages fetched; the city code is on Municode, which stays closed), so the page is incomplete. Searched 2026-11-09.

Water/sewer provider: City of Hurricane (water, sewer, power); Washington County Water Conservancy District (regional water)

LinePrinted ratePrototypeReceipt
WCWCD regional water impact fee, residential 3/4 or 5/8-inch meter (standard)
water
$17,266
per meter (Washington County Water Conservancy District)
$17,266Printed; $11,413 for water efficient connection
Effective 2026-08-06
Source ยท WCWCD Impact Fees page, Standard single-meter fees, Residential
fetched 2026-11-09, sha256 c19f9424f784

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.