Herriman, UT
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: Included: Herriman city water impact/right fee (lot under 0.25 acre), park, traffic, safety and fire impact fees from the city single family permit fee sheet effective 1/20/2026.Included also: JBID Service Area No. 1 sewer impact fee $6,637.31 (src 659; area assignment not determined). Included also: building permit, 65% plan review and state surcharge on the city own valuation factors, zoning, electrical, mechanical, plumbing and grading fees, $300 water connection and $131 water jumper from the January 2026 single family fee calculation sheet. Missing: other JBID sewer hook-up fees (the city does not collect them), secondary water. Searched 2026-11-09.
Water/sewer provider: Herriman City (water); Jordan Basin Improvement District (sewer)
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water impact/right fee, lot under 0.25 acre water | $5,274 per lot, by acreage | $5,274 | Printed; lot under .25 acre (7,000 sq ft assumed); .25-.49 acre $6,932, up to $9,585 at 1-1.25 acres Effective 2026-01-20 Source · Herriman City Building Permit Fees for Single Family Dwellings, effective 1/20/2026 fetched 2026-11-09, sha256 833e5a7af16a |
| Park impact fee parks | $3,550.64 per dwelling | $3,550.64 | Printed Effective 2026-01-20 Source · Herriman City Building Permit Fees for Single Family Dwellings, effective 1/20/2026 fetched 2026-11-09, sha256 833e5a7af16a |
| Traffic impact fee transportation | $3,848.67 per dwelling | $3,848.67 | Printed Effective 2026-01-20 Source · Herriman City Building Permit Fees for Single Family Dwellings, effective 1/20/2026 fetched 2026-11-09, sha256 833e5a7af16a |
| Safety impact fee public_safety | $201.13 per dwelling | $201.13 | Printed Effective 2026-01-20 Source · Herriman City Building Permit Fees for Single Family Dwellings, effective 1/20/2026 fetched 2026-11-09, sha256 833e5a7af16a |
| Fire impact fee fire | $549.16 per dwelling | $549.16 | Printed Effective 2026-01-20 Source · Herriman City Building Permit Fees for Single Family Dwellings, effective 1/20/2026 fetched 2026-11-09, sha256 833e5a7af16a |
| Jordan Basin Improvement District sewer impact fee, single family (Service Area No. 1) sewer | $6,637.31 per unit (effective March 1, 2026) | $6,637.31 | Printed; Table 6 of the JBID Sewer Impact Fee Analysis adopted by Resolution 11-25-2025-04; Herriman parcels may fall in Service Area 1 or 3, parcel not determined Effective 2026-01-20 Source · JBID Sewer Impact Fee Analysis Nov 2025, Table 6 Impact Fee by Land Use Type fetched 2026-11-09, sha256 d7cd4e0fa703 |
| Building permit fee (valuation-based) permit · computed | $1,943.75 for 1st $100,000 of valuation plus $9 for each additional $1,000 percent of valuation | $2,969.75 | City valuation $213,812 (sheet factors: finished main and upper $99.26 x 2,000 sq ft + garage $38.23 x 400 sq ft); 114 additional $1,000 units x 9 + 1,943.75 = 2,969.75. Uses the city own factors, not the Padstake $380,268 Effective 2026-01-20 Source · Herriman City Building Permit Fees for Single Family Dwellings, effective 1/20/2026, page 2 (fee calculation) fetched 2026-11-09, sha256 833e5a7af16a |
| Plan review fee (first-time) permit · computed | 65% of building permit fee percent of permit fee | $1,930.34 | 65% x 2,969.75 = 1,930.34 Effective 2026-01-20 Source · Herriman City Building Permit Fees for Single Family Dwellings, effective 1/20/2026, page 2 (fee calculation) fetched 2026-11-09, sha256 833e5a7af16a |
| Zoning review fee permit | $35.00 flat | $35 | Printed Effective 2026-01-20 Source · Herriman City Building Permit Fees for Single Family Dwellings, effective 1/20/2026 fetched 2026-11-09, sha256 833e5a7af16a |
| Electrical fee permit | $47.00 flat | $47 | Printed Effective 2026-01-20 Source · Herriman City Building Permit Fees for Single Family Dwellings, effective 1/20/2026 fetched 2026-11-09, sha256 833e5a7af16a |
| Mechanical fee permit | $17.00 flat | $17 | Printed Effective 2026-01-20 Source · Herriman City Building Permit Fees for Single Family Dwellings, effective 1/20/2026 fetched 2026-11-09, sha256 833e5a7af16a |
| Plumbing fee permit | $17.00 flat | $17 | Printed Effective 2026-01-20 Source · Herriman City Building Permit Fees for Single Family Dwellings, effective 1/20/2026 fetched 2026-11-09, sha256 833e5a7af16a |
| Grading fee permit | $23.50 flat | $23.50 | Printed Effective 2026-01-20 Source · Herriman City Building Permit Fees for Single Family Dwellings, effective 1/20/2026 fetched 2026-11-09, sha256 833e5a7af16a |
| State surcharge permit · computed | 1% of building permit, electrical, mechanical and plumbing fees percent | $30.51 | 1% x (2,969.75 + 47.00 + 17.00 + 17.00) = 30.51 Effective 2026-01-20 Source · Herriman City Building Permit Fees for Single Family Dwellings, effective 1/20/2026, page 2 (fee calculation) fetched 2026-11-09, sha256 833e5a7af16a |
| Water connection fee water | $300.00 flat | $300 | Printed Effective 2026-01-20 Source · Herriman City Building Permit Fees for Single Family Dwellings, effective 1/20/2026 fetched 2026-11-09, sha256 833e5a7af16a |
| Water jumper fee water | $131.00 flat | $131 | Printed Effective 2026-01-20 Source · Herriman City Building Permit Fees for Single Family Dwellings, effective 1/20/2026 fetched 2026-11-09, sha256 833e5a7af16a |
| Total listed | $25,562.01 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.