Padstake
Menu

Weatherford, TX

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$19,489.43listed total
Nonerank by 2025 new single-family permits

Not included: Full total from Weatherford posted documents. Included: water impact $2,332 and wastewater impact $2,227 (3/4-inch meter), roadway impact fee at the highest service area A $3,186.43 (Area B $1,814.50, Area C $1,781.30), park fee $1,164, building permit $0.67/sq ft x 2,000 = $1,340 (all trades and plan review), 3/4-inch meter set $440, water tap (1-inch, smallest listed) $4,750 and 4-inch wastewater tap $4,050. Impact fee amounts are the city estimates (impact schedule effective 2022 study; final amounts set before permit issuance). Not included: stormwater, fire, school fees, outside-city rates. Read 2026-11-10.

Water/sewer provider: City of Weatherford (water, wastewater)

LinePrinted ratePrototypeReceipt
Water impact fee, 3/4-inch meter
water
$2,332
per 3/4-inch meter
$2,332Printed (estimate; final set before permit issuance)
Effective 2026-02-10
Source · Weatherford Residential Fees page (read 2026-11-10), Impact Fees
fetched 2026-11-10, sha256 1729cfbc1624
Wastewater impact fee, 3/4-inch meter
sewer
$2,227
per 3/4-inch meter
$2,227Printed (estimate; final set before permit issuance)
Effective 2026-02-10
Source · Weatherford Residential Fees page (read 2026-11-10), Impact Fees
fetched 2026-11-10, sha256 1729cfbc1624
Roadway impact fee, Service Area A (highest of three areas)
transport
$3,186.43
per single-family home; Area B $1,814.50, Area C $1,781.30
$3,186.43Printed; headline is highest area, range 1,781.30-3,186.43
Effective 2026-02-10
Source · Weatherford Residential Fees page (read 2026-11-10), Roadway Impact Fees
fetched 2026-11-10, sha256 1729cfbc1624
Total park fee (parkland + park development), single-family
park
$1,164
per dwelling
$1,164Printed
Effective 2026-02-10
Source · Weatherford FY2026 Fee Schedule, effective Feb 10 2026 (read 2026-11-10), Development Services
fetched 2026-11-10, sha256 8208e035559d
Building permit, new residential house (includes electric, plumbing, mechanical, plan review, driveway)
permit · computed
$0.67
per sq ft
$1,340Computed 0.67 x 2,000 sq ft heated
Effective 2026-02-10
Source · Weatherford FY2026 Fee Schedule, effective Feb 10 2026 (read 2026-11-10), Building - New
fetched 2026-11-10, sha256 8208e035559d
Water meter set, 3/4-inch
water
$440
per meter
$440Printed
Effective 2026-02-10
Source · Weatherford FY2026 Fee Schedule, effective Feb 10 2026 (read 2026-11-10), Utilities
fetched 2026-11-10, sha256 8208e035559d
Water tap, 1-inch (smallest size listed)
water
$4,750
per tap
$4,750Printed; 1-inch assumed for a 3/4-inch meter
Effective 2026-02-10
Source · Weatherford FY2026 Fee Schedule, effective Feb 10 2026 (read 2026-11-10), Utilities
fetched 2026-11-10, sha256 8208e035559d
Wastewater tap, 4-inch
sewer
$4,050
per tap
$4,050Printed
Effective 2026-02-10
Source · Weatherford FY2026 Fee Schedule, effective Feb 10 2026 (read 2026-11-10), Utilities
fetched 2026-11-10, sha256 8208e035559d
Total listed$19,489.43

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.