Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. Impact fees verified from the city Impact Fee Ordinance Guide: inside city limits $4,500 per single-family lot ($1,000 water + $2,000 wastewater + $1,500 roadway), ETJ $5,378 ($1,804 water + $3,574 wastewater, no roadway); the headline uses the ETJ column (highest total) with the city-limits split shown. 100% collection applies from June 2025. Roadway fee ($1,500 inside city limits, service areas 5 and 8 none) is not in the loaded lines. Permit lines from the Waco Building Permits Fee Schedule page. Missing: water and wastewater tap/meter fees, trade permits, residential certificate of occupancy amount, so no total. Searched 2026-11-09 (lane A).
Water/sewer provider: City of Waco
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water impact fee, single-family, extraterritorial jurisdiction (highest area; inside city limits $1,000) water | $1,804 Water per single family in ETJ per single-family lot | $1,804 | Highest printed area ETJ $1,804; inside city limits $1,000 Effective 2021-06-01 Source · Waco Impact Fee Ordinance Guide (Ordinance 2020-793, effective June 1, 2021; 100% phase-in reached June 2025) fetched 2026-11-09, sha256 ec526e67300e |
| Wastewater impact fee, single-family, extraterritorial jurisdiction (highest area; inside city limits $2,000) sewer | $3,574 Wastewater per single family in ETJ per single-family lot | $3,574 | Highest printed area ETJ $3,574; inside city limits $2,000 Effective 2021-06-01 Source · Waco Impact Fee Ordinance Guide (Ordinance 2020-793, effective June 1, 2021; 100% phase-in reached June 2025) fetched 2026-11-09, sha256 ec526e67300e |
| Residential structures building permit (living, non-living area and accessory structures) permit · computed | $0.45 per sq. ft. per sq ft | $1,080 | 0.45 x 2,400 sq ft (2,000 heated + 400 garage, non-living area counted) = 1,080.00 Effective n/a Source · Building Permits Fee Schedule, Residential Structures fetched 2026-11-09, sha256 dc4a902042ec |
| Non-refundable residential plan submittal fee permit | $60 per plan | $60 | Printed Effective n/a Source · Building Permits Fee Schedule fetched 2026-11-09, sha256 dc4a902042ec |
| Technology fee, building permit | $15 per permit | $15 | Printed Effective n/a Source · Building Permits Fee Schedule fetched 2026-11-09, sha256 dc4a902042ec |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.