Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: Included: 5/8-inch water meter and tap, sewer tap and activation (city New Construction page) and new residential building permit at $0.47/sq ft on 2,000 sq ft (assumed), 20% plan check and certificate of occupancy (Schedule of Fees). Tyler posts no impact fee. Not included: plumbing permit ($6 per fixture, count unknown), electrical (per circuit), mechanical ($50 minimum), $50 utility connection fee, deposits. Neither page is dated (fetched 2026-11-09, shows Adopted FY2027 budget banner). Searched 2026-11-09 (lane A).
Water/sewer provider: City of Tyler
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water meter, 5/8-inch water | $467.00 per meter, by size | $467 | Printed Effective n/a Source · New Construction page, Meter + Tap Fees fetched 2026-11-09, sha256 a9bd438a25ec |
| Water tap, 5/8-inch meter water | $1,640.00 per tap | $1,640 | Printed (meter and tap total $2,107.00) Effective n/a Source · New Construction page, Meter + Tap Fees fetched 2026-11-09, sha256 a9bd438a25ec |
| Sewer tap sewer | $2,050.00 per tap | $2,050 | Printed Effective n/a Source · New Construction page, Meter + Tap Fees fetched 2026-11-09, sha256 a9bd438a25ec |
| Sewer activation sewer | $26.50 per activation | $26.50 | Printed (total with sewer $4,183.50) Effective n/a Source · New Construction page, Meter + Tap Fees fetched 2026-11-09, sha256 a9bd438a25ec |
| Residential new construction building permit permit · computed | $0.47 per square foot (all new construction); minimum fee $50.00 per sq ft | $940 | 0.47 x 2,000 sq ft heated = 940.00 Effective n/a Source · Schedule of Fees, Residential Construction - New Construction fetched 2026-11-09, sha256 08037f5dcd1c |
| Plan check fee, residential new construction permit · computed | 20% of Total Permit Fee percent of permit fee | $188 | 20% x 940.00 = 188.00 Effective n/a Source · Schedule of Fees fetched 2026-11-09, sha256 08037f5dcd1c |
| Certificate of occupancy permit | $80.00 flat | $80 | Printed Effective n/a Source · Schedule of Fees fetched 2026-11-09, sha256 08037f5dcd1c |
| Total listed | $5,391.50 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.