The Colony, TX
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: Included: water impact fee $1,653 and sewer impact fee $990 for a 5/8-inch x 3/4-inch meter (the schedule prints two plat-date tables, final plat before Sept 30 2007: water $768, sewer $990; after Oct 1 2007: water $1,653, sewer $815; highest of each shown), 5/8-inch tap and meter $475, 4-inch sewer tap $570, new residential home permit $1.01 per sq ft x 2,000 sq ft = $2,020, residential plan review $100 and certificate of occupancy $75 (City of The Colony Master Fee Schedule Oct 1 2026 to Sept 30 2027; the fee and impact tables were read visually). Not included: per-foot charge for connections over 50 feet, bore of a paved road ($500), plumbing and other trade permits, application fee $50. Searched 2026-11-09 (lane A).
Water/sewer provider: City of The Colony
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water impact fee, 5/8-inch x 3/4-inch meter impact · computed | $1,653.00 (property final platted after October 1, 2007; before September 30, 2007 $768.00) per meter | $1,653 | Highest printed (after-2007 plats) shown; range $768 to $1,653 Effective 2026-10-01 Source · City of The Colony Master Fee Schedule October 1, 2026 - September 30, 2027, Water & Sewer Impact (page 6) fetched 2026-11-09, sha256 04d848432905 |
| Sewer impact fee, 5/8-inch x 3/4-inch meter impact · computed | $990.00 (property final platted before September 30, 2007; after October 1, 2007 $815.00) per meter | $990 | Highest printed (before-2007 plats) shown; range $815 to $990 Effective 2026-10-01 Source · City of The Colony Master Fee Schedule October 1, 2026 - September 30, 2027, Water & Sewer Impact (page 6) fetched 2026-11-09, sha256 04d848432905 |
| 5/8-inch tap and meter (service connection within 50 feet) water | $475.00 (3/4-inch tap and meter $595.00) per tap and meter | $475 | Printed Effective 2026-10-01 Source · City of The Colony Master Fee Schedule October 1, 2026 - September 30, 2027, Water Meter Fees (page 4) fetched 2026-11-09, sha256 04d848432905 |
| 4-inch sewer tap sewer | $570.00 per tap | $570 | Printed Effective 2026-10-01 Source · City of The Colony Master Fee Schedule October 1, 2026 - September 30, 2027, Sewer/Fire Line Tap Fees (page 3) fetched 2026-11-09, sha256 04d848432905 |
| New residential home building permit permit · computed | $1.01 per square foot 2,000 sq ft | $2,020 | 1.01 x 2,000 = 2,020.00 (assumed 2,000 sq ft) Effective 2026-10-01 Source · City of The Colony Master Fee Schedule October 1, 2026 - September 30, 2027, New Residential Home Permits (page 5) fetched 2026-11-09, sha256 04d848432905 |
| Residential plan review permit | $100.00 per dwelling | $100 | Printed Effective 2026-10-01 Source · City of The Colony Master Fee Schedule October 1, 2026 - September 30, 2027, page 3 fetched 2026-11-09, sha256 04d848432905 |
| Certificate of occupancy permit | $75.00 per dwelling | $75 | Printed Effective 2026-10-01 Source · City of The Colony Master Fee Schedule October 1, 2026 - September 30, 2027, page 3 fetched 2026-11-09, sha256 04d848432905 |
| Total listed | $5,883 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.