Round Rock, TX
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: Includes building permit, water meter, water/sewer line, water and wastewater impact fees (plats recorded after 1/1/2024), roadway impact fee (plat after 1/1/2025, highest area A; range B-D $7,285.38). Roadway vehicle-miles 3.18 per single-family detached dwelling are from the 2023 Roadway Impact Fee Study (updated April 2024, Table 9, src 378) behind ordinance O-2023-378; the older 2019 table factor of 4.26 is superseded. Older plats pay less (e.g. water $4,234, sewer $1,799 for plats after 2/1/2021). Not included: irrigation, plumbing/electrical/mechanical sub-permits, school fees. Lane A 2026-11-08.
Water/sewer provider: City of Round Rock
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Building permit fee, new single-family permit | $485 flat | $485 | Printed Effective n/a Source · New Single Family Construction page fetched 2026-11-08, sha256 d73bbfee8e90 |
| Water meter fee, 5/8-inch water | $320 per meter | $320 | Printed Effective n/a Source · same page fetched 2026-11-08, sha256 d73bbfee8e90 |
| Water/sewer line fee sewer | $200 flat | $200 | Printed Effective n/a Source · same page fetched 2026-11-08, sha256 d73bbfee8e90 |
| Water impact fee, plats recorded after Jan 1, 2024, 5/8-inch meter (1 LUE) water · computed | $4,912 per LUE per LUE | $4,912 | 4,912 x 1 LUE = 4,912 Effective n/a Source · same page fetched 2026-11-08, sha256 d73bbfee8e90 |
| Wastewater impact fee, plats recorded after Jan 1, 2024, 5/8-inch meter (1 LUE) sewer · computed | $2,921 per LUE per LUE | $2,921 | 2,921 x 1 LUE = 2,921 Effective n/a Source · same page fetched 2026-11-08, sha256 d73bbfee8e90 |
| Roadway impact fee, plat after Jan 1, 2025, Service Area A (Areas B, C, D: $2,291 per service unit = $7,285.38) transportation · computed | $3,444 per service unit (highest area) per service unit (vehicle-mile) x 3.18 per single-family dwelling | $10,951.92 | 3,444 x 3.18 = 10,951.92 Effective n/a Source · Roadway Impact Fee page, Phase 4; 3.18 vehicle-miles per single-family detached dwelling from the 2023 Roadway Impact Fee Study, Table 9 (src 378) fetched 2026-11-08, sha256 a566d31b0464 |
| Total listed | $19,789.92 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.