Rosenberg, TX
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: City of Rosenberg Schedule of Fees (rosenbergtx.gov DocumentCenter 2576, src 402; includes resolutions through Aug 18 2026). Covered area 2,400 sq ft assumed (garage included). 3/4-inch meter assumed for the 5/8 x 3/4 impact fee row (meter fee is listed for 3/4 inch). Older plats pay less (plats 9/1/2020-12/18/2023: water $1,567.50, sewer $1,409.00). Not included: electrical, plumbing and HVAC permits ($20 application each plus per-outlet/fixture/ton charges), boring fees, utility deposit, 1-2 day new service meter installation $800 (optional). No roadway or parks impact fee found. Lane A 2026-11-09.
Water/sewer provider: City of Rosenberg
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Building permit, new single-family residential construction permit · computed | $0.50 per square foot of covered area per sq ft of covered area | $1,200 | 0.50 x 2,400 sq ft (covered area incl. garage, assumed) = 1,200.00 Effective n/a Source · Schedule of Fees, Building Valuation Permit Fees exception fetched 2026-11-09, sha256 a7ff470fdb4d |
| Plan review fee permit · computed | 50% of building permit fee percent | $600 | 0.50 x 1,200.00 = 600.00 Effective n/a Source · Schedule of Fees, Plan Review Fees fetched 2026-11-09, sha256 a7ff470fdb4d |
| Certificate of occupancy (Fire Marshal) permit | $100.00 flat | $100 | Printed Effective n/a Source · Schedule of Fees, Fire Marshal Fees fetched 2026-11-09, sha256 a7ff470fdb4d |
| Water meter fee, 3/4-inch water | $600.00 by meter size | $600 | Printed Effective n/a Source · Schedule of Fees, Water Meter & Tap Fees fetched 2026-11-09, sha256 a7ff470fdb4d |
| New construction water tap inspection water | $100.00 flat | $100 | Printed Effective n/a Source · Schedule of Fees, utility fees fetched 2026-11-09, sha256 a7ff470fdb4d |
| New home meter inspection water | $45.00 flat | $45 | Printed Effective n/a Source · Schedule of Fees, utility fees fetched 2026-11-09, sha256 a7ff470fdb4d |
| Sewer tap fee, 4-inch sewer | $635.00 by tap size | $635 | Printed Effective n/a Source · Schedule of Fees, Sewer Tap Fee fetched 2026-11-09, sha256 a7ff470fdb4d |
| New construction sewer tap inspection sewer | $100.00 flat | $100 | Printed Effective n/a Source · Schedule of Fees, utility fees fetched 2026-11-09, sha256 a7ff470fdb4d |
| Water impact fee, 5/8 x 3/4-inch meter, plats filed on or after 12-19-2023 water | $2,693.00 per meter, by size | $2,693 | Printed Effective n/a Source · Schedule of Fees, Impact Fees (Ord. 2023-47) fetched 2026-11-09, sha256 a7ff470fdb4d |
| Sewer impact fee, 5/8 x 3/4-inch meter, plats filed on or after 12-19-2023 sewer | $2,100.00 per meter, by size | $2,100 | Printed Effective n/a Source · Schedule of Fees, Impact Fees (Ord. 2023-47) fetched 2026-11-09, sha256 a7ff470fdb4d |
| Total listed | $8,173 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.