Parker, TX

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$14,235.17listed total
Nonerank by 2025 new single-family permits

Not included: Full total from Parker posted Fee Schedule (October 2026). Included: water impact fee $8,269.17 (1-inch meter, smallest listed), 1-inch meter requiring tap $3,000, sewer connection $1,500 (many Parker lots are on septic), building permit base $1,250 (2,400 sq ft under roof) plus electrical, plumbing and mechanical $0.03/sq ft each ($216). Not included: refundable $1,000 new-construction permit deposit, roadway, park and school fees (none posted), road bore at cost, water meter box $100. Read 2026-11-10.

Water/sewer provider: City of Parker (water, sewer)

LinePrinted ratePrototypeReceipt
Water impact fee, 1-inch meter (smallest size listed)
water
$8,269.17
per 1-inch meter
$8,269.17Printed; 1-inch assumed for a single-family home
Effective 2026-10-01
Source · Parker Fee Schedule, October 2026 (FY26-27; read 2026-11-10), Water Impact Fees
fetched 2026-11-10, sha256 176e3daeae20
Water meter, 1-inch requiring tap (includes up to 100 ft of service line)
water
$3,000
per meter
$3,000Printed
Effective 2026-10-01
Source · Parker Fee Schedule, October 2026 (FY26-27; read 2026-11-10), Water Meter Fees
fetched 2026-11-10, sha256 176e3daeae20
Sewer service connection fee
sewer
$1,500
per connection
$1,500Printed (where city sewer is available)
Effective 2026-10-01
Source · Parker Fee Schedule, October 2026 (FY26-27; read 2026-11-10), Sewer Service
fetched 2026-11-10, sha256 176e3daeae20
Building permit base fee, new construction, 2,251-2,500 sq ft under roof
permit · computed
$1,250
per band of total sq ft under roof
$1,250Computed: 2,000 sq ft heated + 400 sq ft garage = 2,400 sq ft under roof
Effective 2026-10-01
Source · Parker Fee Schedule, October 2026 (FY26-27; read 2026-11-10), Construction Permits
fetched 2026-11-10, sha256 176e3daeae20
Electrical, plumbing and mechanical permit fees, $0.03 per sq ft each
permit · computed
$0.03
per sq ft for each of electrical, plumbing, mechanical
$216Computed 3 x 0.03 x 2,400 sq ft
Effective 2026-10-01
Source · Parker Fee Schedule, October 2026 (FY26-27; read 2026-11-10), Construction Permits
fetched 2026-11-10, sha256 176e3daeae20
Total listed$14,235.17

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.