Parker, TX
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: Full total from Parker posted Fee Schedule (October 2026). Included: water impact fee $8,269.17 (1-inch meter, smallest listed), 1-inch meter requiring tap $3,000, sewer connection $1,500 (many Parker lots are on septic), building permit base $1,250 (2,400 sq ft under roof) plus electrical, plumbing and mechanical $0.03/sq ft each ($216). Not included: refundable $1,000 new-construction permit deposit, roadway, park and school fees (none posted), road bore at cost, water meter box $100. Read 2026-11-10.
Water/sewer provider: City of Parker (water, sewer)
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water impact fee, 1-inch meter (smallest size listed) water | $8,269.17 per 1-inch meter | $8,269.17 | Printed; 1-inch assumed for a single-family home Effective 2026-10-01 Source · Parker Fee Schedule, October 2026 (FY26-27; read 2026-11-10), Water Impact Fees fetched 2026-11-10, sha256 176e3daeae20 |
| Water meter, 1-inch requiring tap (includes up to 100 ft of service line) water | $3,000 per meter | $3,000 | Printed Effective 2026-10-01 Source · Parker Fee Schedule, October 2026 (FY26-27; read 2026-11-10), Water Meter Fees fetched 2026-11-10, sha256 176e3daeae20 |
| Sewer service connection fee sewer | $1,500 per connection | $1,500 | Printed (where city sewer is available) Effective 2026-10-01 Source · Parker Fee Schedule, October 2026 (FY26-27; read 2026-11-10), Sewer Service fetched 2026-11-10, sha256 176e3daeae20 |
| Building permit base fee, new construction, 2,251-2,500 sq ft under roof permit · computed | $1,250 per band of total sq ft under roof | $1,250 | Computed: 2,000 sq ft heated + 400 sq ft garage = 2,400 sq ft under roof Effective 2026-10-01 Source · Parker Fee Schedule, October 2026 (FY26-27; read 2026-11-10), Construction Permits fetched 2026-11-10, sha256 176e3daeae20 |
| Electrical, plumbing and mechanical permit fees, $0.03 per sq ft each permit · computed | $0.03 per sq ft for each of electrical, plumbing, mechanical | $216 | Computed 3 x 0.03 x 2,400 sq ft Effective 2026-10-01 Source · Parker Fee Schedule, October 2026 (FY26-27; read 2026-11-10), Construction Permits fetched 2026-11-10, sha256 176e3daeae20 |
| Total listed | $14,235.17 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.