Padstake
Menu

Odessa, TX

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
88rank by 2025 new single-family permits

Impact fees verified. Not a full total. IMPACT FEES VERIFIED ONLY. Included: Odessa water, wastewater and roadway impact fees, single-family collection rates (Ordinances 2021-27 and 2022-12, Article 10-4, odessa-tx.gov, src 496; rendered pages 5-6 transcribed into the stored text, original kept as .bak). Roadway uses the highest areas (One and Three) with 2.97 vehicle-miles per single-family detached dwelling from the July 2021 study (src 497). Missing: building permit (only a 2018 master permit fee schedule, src 61, and a current Master Permit Fee Schedule not retrieved), water and sewer tap fees. Lane A 2026-11-09.

Water/sewer provider: City of Odessa

LinePrinted ratePrototypeReceipt
Water impact fee collection rate (single family), 3/4-inch meter
water
$389.01
per meter, by size
$389.01Printed
Effective 2022-05-24
Source · Sec. 10-4-33(b)
fetched 2026-11-09, sha256 609794ae219f
Wastewater impact fee collection rate (single family), 3/4-inch meter
sewer
$831.01
per meter, by size
$831.01Printed
Effective 2022-05-24
Source · Sec. 10-4-33(a)
fetched 2026-11-09, sha256 609794ae219f
Roadway impact fee collection rate (single family), Service Areas One and Three $599.32 per vehicle-mile (Area Two $262.62 = $779.98)
transportation · computed
$599.32 per vehicle-mile
per vehicle-mile x 2.97 per single-family dwelling
$1,779.98599.32 x 2.97 = 1,779.98
Effective 2022-05-24
Source · Sec. 10-4-33(c); 2.97 vehicle-miles from the July 2021 study sample calculation (src 497)
fetched 2026-11-09, sha256 609794ae219f

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.