Midland, TX
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
$7,131.85listed total
66rank by 2025 new single-family permits
Not included: trade permits (electrical building wiring $0.05 per sq ft, plumbing and mechanical minimums of $50, listed "when not part of building permit"), sales tax, and any fee for a lot-specific paving cut. Water and wastewater impact fees and tap charges use the 1-inch row (the smallest printed). Roadway impact fee uses the highest service area (D); range shown. Midland's water and wastewater impact fee tables are in Ordinance 9960 (effective Oct 1 2019); the fee schedule is Ordinance 10710 (effective Feb 1 2026).
Water/sewer provider: City of Midland
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Roadway impact fee, single-family detached house (Service Area D) transportation | $3,047.22 per dwelling unit (Area D); A $3,020.49, B $2,319.57, C $2,093.85, E $0 per dwelling unit, by service area | $3,047.22 | Rule: service area depends on the lot; Area D, the highest, is used. Range $0 (Area E) to $3,047.22. Amounts are after the 50% general credit; the 25% housing credit expired on the fifth anniversary of Oct 1 2019. Effective 2019-10-01 Source · Roadway Impact Fees table, Residential fetched 2026-11-07, sha256 cb4dc8aa1408 |
| Water impact fee, 1-inch meter (smallest size printed) water | $1,656.12 (after 50% general credit) per meter, by size | $1,656.12 | Midland prints water and wastewater impact fees and tap charges from the 1-inch size up (no 3/4-inch row); the 1-inch row, the smallest printed, is used for the 3/4-inch prototype. Effective 2019-10-01 Source · Sec. 11-14-5(A) table (also posted as image, src 56) fetched 2026-11-07, sha256 533ddccebef4 |
| Wastewater impact fee, 1-inch meter (smallest size printed) sewer | $838.41 (after 50% general credit) per meter, by size | $838.41 | Midland prints water and wastewater impact fees and tap charges from the 1-inch size up (no 3/4-inch row); the 1-inch row, the smallest printed, is used for the 3/4-inch prototype. Effective 2019-10-01 Source · Sec. 11-14-5(B) table (also posted as image, src 56) fetched 2026-11-07, sha256 533ddccebef4 |
| 1-inch service charge for tap and meter (with meter box) water | 457.41 per tap and meter, by size | $457.41 | Midland prints water and wastewater impact fees and tap charges from the 1-inch size up (no 3/4-inch row); the 1-inch row, the smallest printed, is used for the 3/4-inch prototype. Effective 2026-02-01 Source · Exhibit H, Water Meters & Tap Fees fetched 2026-11-07, sha256 aae9bde15528 |
| 4-inch sewer tap sewer | 376.69 per tap | $376.69 | Printed; 4-inch is the smaller of the two sewer tap sizes printed (4-inch and 6-inch) Effective 2026-02-01 Source · Exhibit H, Water Meters & Tap Fees fetched 2026-11-07, sha256 aae9bde15528 |
| Residential construction permit fee permit · computed | 31.5 cents per sq. ft. per square foot | $756 | 2,400 sq ft (2,000 heated + 400 garage, assumed all counted) x $0.315 = $756.00 Effective 2026-02-01 Source · Exhibit H, Building Permits, Residential fetched 2026-11-07, sha256 aae9bde15528 |
| Total listed | $7,131.85 |
Fee-change calendar
- None recorded