Marble Falls, TX
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: Included: water and wastewater impact fees (effective Nov 1 2025), city-installed 3/4-inch water tap and 4-inch sewer tap, residential plan review and per-square-foot building permit (Fee Schedules page, marblefallstx.gov). Not included: the "10% per trade" add-on to the building permit (number of trades not stated, not guessed), utility security deposit ($150 residential 3/4-inch), meter/other items, no roadway or parks impact fee posted. Square footage assumed 2,000 heated. Searched 2026-11-09 (lane A).
Water/sewer provider: City of Marble Falls
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water impact fee, 3/4-inch meter water | $6,626.00 per meter, by size | $6,626 | Printed Effective 2025-11-01 Source · Fee Schedules page, Utility Fees: Impact Fees fetched 2026-11-09, sha256 70ab62f00667 |
| Wastewater impact fee, 3/4-inch meter sewer | $7,903.00 per meter, by size | $7,903 | Printed (combined 14,529.00) Effective 2025-11-01 Source · Fee Schedules page, Utility Fees: Impact Fees fetched 2026-11-09, sha256 70ab62f00667 |
| Water tap and connection fee, 3/4-inch, city installed water | $3,320.35 per tap, by meter size | $3,320.35 | Printed (contractor connection where tap exists: $347.96) Effective n/a Source · Fee Schedules page, Water Tap and Connection Fees fetched 2026-11-09, sha256 70ab62f00667 |
| Wastewater tap and connection fee, regular 4-inch, city installed sewer | $2,073.91 per tap | $2,073.91 | Printed Effective n/a Source · Fee Schedules page, Wastewater Tap and Connection Fees fetched 2026-11-09, sha256 70ab62f00667 |
| New residential plan review, 3,000 sq ft or less permit | $100 per plan | $100 | Printed Effective n/a Source · Fee Schedules page, Residential Permit Fees fetched 2026-11-09, sha256 70ab62f00667 |
| New residential construction building permit (includes all trades) permit · computed | $0.50/sq ft plus 10% per trade per sq ft | $1,000 | 0.50 x 2,000 sq ft heated = 1,000.00 (10% per-trade add-on not applied, trade count not posted) Effective n/a Source · Fee Schedules page, Residential Permit Fees fetched 2026-11-09, sha256 70ab62f00667 |
| Total listed | $21,023.26 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.