Padstake
Menu

Manvel, TX

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$28,645listed total
119rank by 2025 new single-family permits

Not included: City of Manvel Fee Schedule (cityofmanvel.com DocumentCenter 2184, src 481): building permit fees page 4, impact fees adopted by Ordinance 2026-O-22 on 9/21/2026, utility fees Resolution 2026-R-44 of 9/21/2026. Scanned PDF read from rendered pages 4 and 16; transcription appended to the stored text (original text kept as .bak-garbled). 2,000 sq ft heated assumed. Not included: boring costs (half the cost of any required bore), $500 builder deposit per initial water tap, utility deposit $75, new account $20, drainage/other district fees, MUD fees (Manvel has MUDs in new subdivisions). No roadway or parks impact fee found. Lane A 2026-11-09.

Water/sewer provider: City of Manvel

LinePrinted ratePrototypeReceipt
Residential construction permit application fee
permit · computed
$0.40/sq. ft.
per sq ft
$8000.40 x 2,000 sq ft heated = 800.00
Effective 2026-09-21
Source · Fee Schedule page 4
fetched 2026-11-09, sha256 fdafd7ad60ef
Plan review fee
permit · computed
1/2 OF THE BUILDING PERMIT FEE
half of permit fee
$4000.50 x 800.00 = 400.00
Effective 2026-09-21
Source · Fee Schedule page 4
fetched 2026-11-09, sha256 fdafd7ad60ef
Residential streamline permits for electrical, plumbing and HVAC (minimum 25% of the building permit fee for each of three categories)
permit · computed
MINIMUM OF 25% OF THE BUILDING PERMIT FEE FOR EACH CATEGORY
percent of permit fee x 3 categories
$6000.25 x 800.00 x 3 = 600.00 (minimum)
Effective 2026-09-21
Source · Fee Schedule page 4
fetched 2026-11-09, sha256 fdafd7ad60ef
Final plumbing inspection, single-family residential
permit
$50
flat
$50Printed
Effective 2026-09-21
Source · Fee Schedule page 16
fetched 2026-11-09, sha256 fdafd7ad60ef
Customer service inspection, single-family residential
permit
$100
flat
$100Printed
Effective 2026-09-21
Source · Fee Schedule page 16
fetched 2026-11-09, sha256 fdafd7ad60ef
Water connection fee, single-family residential 3/4-inch (plus 1/2 cost of any required bore)
water
$550
per connection
$550Printed
Effective 2026-09-21
Source · Fee Schedule page 16
fetched 2026-11-09, sha256 fdafd7ad60ef
Sewer connection fee, single-family residential (plus 1/2 cost of any required bore)
sewer
$750
per connection
$750Printed
Effective 2026-09-21
Source · Fee Schedule page 16
fetched 2026-11-09, sha256 fdafd7ad60ef
Water impact fee, 3/4-inch meter, adopted 9/21/2026
water
$5,458
per meter, by size
$5,458Printed
Effective 2026-09-21
Source · Fee Schedule page 4
fetched 2026-11-09, sha256 fdafd7ad60ef
Wastewater impact fee, 3/4-inch meter, adopted 9/21/2026
sewer
$19,937
per meter, by size
$19,937Printed
Effective 2026-09-21
Source · Fee Schedule page 4
fetched 2026-11-09, sha256 fdafd7ad60ef
Total listed$28,645

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.