Lockhart, TX
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: Included: water, wastewater and roadway impact fees, water and sewer taps, residential building, plan check, plumbing, electric and mechanical permits (FY 2026-2027 Comprehensive Fee Schedule, Ordinance 2026-36, effective Sep 16 2026). Roadway uses the highest area (Service Area 2) with Area 1 shown; computed from the posted per-vehicle-mile rate and the 2023 study single-family equivalency (1.09 vehicle-miles). Square footage assumed 2,000 heated. Not included: water meter and MXU radio cost (not posted), water deposit, electric service/tap, utility extension costs, parks fee (none posted).
Water/sewer provider: City of Lockhart
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water impact fee, one living unit equivalent (3/4-inch residential meter) water | $4,562.36 per living unit equivalent per LUE | $4,562.36 | Printed, 1 LUE Effective 2026-09-16 Source · Fee Schedule page, Impact Fees fetched 2026-11-09, sha256 6aee9f06a17e |
| Wastewater impact fee, one living unit equivalent sewer | $5,792.42 per living unit equivalent per LUE | $5,792.42 | Printed, 1 LUE Effective 2026-09-16 Source · Fee Schedule page, Impact Fees fetched 2026-11-09, sha256 6aee9f06a17e |
| Roadway impact fee, single-family dwelling (Service Area 2 shown; Service Area 1 is $1,636.09) transportation · computed | $1,806 per vehicle mile (Service Area 2); $1,501 (Service Area 1); single-family 1.09 vehicle-miles per dwelling per vehicle-mile x dwelling | $1,968.54 | Highest area: 1.09 vehicle-miles x 1,806 = 1,968.54; Area 1: 1.09 x 1,501 = 1,636.09 Effective 2023-03-01 Source · 2023 Roadway Impact Fee Program Update (rates also on city Fee Schedule page, src 1009) fetched 2026-11-09, sha256 950be32a0551 |
| Water tap fee, 3/4-inch (meter and MXU radio cost extra, not posted) water | $750.00 plus cost of Meter/MXU per tap, by size | $750 | Printed base $750; meter/MXU cost not posted Effective 2026-09-16 Source · Exhibit B, Water Department fetched 2026-11-09, sha256 94f087060f3c |
| Wastewater tap fee, 4-inch sewer | $1,200.00 per tap | $1,200 | Printed Effective 2026-09-16 Source · Exhibit B, Wastewater Department fetched 2026-11-09, sha256 94f087060f3c |
| Residential dwelling, new construction permit · computed | $0.45 per square foot per sq ft | $900 | 0.45 x 2,000 sq ft heated = 900.00 Effective 2026-09-16 Source · Exhibit B page 8 fetched 2026-11-09, sha256 94f087060f3c |
| Residential plan check fee permit · computed | 50% of building permit fee percent of permit fee | $450 | 50% x 900 = 450.00 Effective 2026-09-16 Source · Exhibit B page 8 fetched 2026-11-09, sha256 94f087060f3c |
| Residential plumbing, new construction permit | $125.00 each | $125 | Printed Effective 2026-09-16 Source · Exhibit B page 8 fetched 2026-11-09, sha256 94f087060f3c |
| Residential electric, new construction permit | $125.00 each | $125 | Printed Effective 2026-09-16 Source · Exhibit B page 8 fetched 2026-11-09, sha256 94f087060f3c |
| Residential mechanical, new construction permit | $125.00 each | $125 | Printed Effective 2026-09-16 Source · Exhibit B page 8 fetched 2026-11-09, sha256 94f087060f3c |
| Total listed | $15,998.32 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.