Kyle, TX
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: City of Kyle Schedule of Rates, Fines, Fees, and Charges, Approved FY 2025-26 Budget (as of 9/17/2025, cityofkyle.gov, src 545). Plats approved on or after 8-27-2025 pay the top impact fee; earlier plats pay less (plats 12-5-2023 to 8-26-2025: water $6,169, sewer $6,345). 2,000 sq ft heated assumed. Tap fees show the base only: the schedule adds an unposted actual cost. No Kyle roadway impact fee is on this schedule. Not included: tap cost, meter, service connection $63.39, deposit $95.09 per LUE, trade permits, storm drainage monthly charge. NOTE: sources 47 and 48 stored under this jurisdiction (j102) are Marana, Arizona documents, not Kyle; the earlier hold note about Marana street fees was about those wrong documents and is superseded. The FY2026-27 budget (adopted Sept 2026) proposed no increase to other rates, fees and charges; the FY2026-27 schedule document itself was not found. Lane A 2026-11-09.
Water/sewer provider: City of Kyle
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Single-family residential base building permit fee permit · computed | $500.00 + $.25 Per SF base plus per sq ft | $1,000 | 500 + 0.25 x 2,000 sq ft heated = 1,000.00 Effective 2025-09-17 Source · Schedule of Rates, Fines, Fees and Charges FY 2025-26, Building fetched 2026-11-09, sha256 8c3a5c338e5c |
| Plan review permit | $75.00 flat | $75 | Printed Effective 2025-09-17 Source · same, Building fetched 2026-11-09, sha256 8c3a5c338e5c |
| Water tap, inside city (plus cost) water | $400.00 + Cost per tap | $400 | Printed (base only; cost not posted) Effective 2025-09-17 Source · same, Public Works fetched 2026-11-09, sha256 8c3a5c338e5c |
| Sewer tap, inside city (plus cost) sewer | $400.00 + Cost per tap | $400 | Printed (base only; cost not posted) Effective 2025-09-17 Source · same, Public Works fetched 2026-11-09, sha256 8c3a5c338e5c |
| Water impact fee per LUE, approved plat dates 8-27-2025 to present (5/8 x 3/4-inch meter = 1 LUE) water | $10,908.00 per LUE | $10,908 | Printed Effective 2025-09-17 Source · same, Engineering Water & Sewer Impact Fees; LUE table page 8 fetched 2026-11-09, sha256 8c3a5c338e5c |
| Sewer impact fee per LUE, approved plat dates 8-27-2025 to present sewer | $8,762.00 per LUE | $8,762 | Printed Effective 2025-09-17 Source · same, Engineering Water & Sewer Impact Fees fetched 2026-11-09, sha256 8c3a5c338e5c |
| Park land fee, per dwelling unit parks | $1,500.00 per dwelling unit | $1,500 | Printed Effective 2025-09-17 Source · same, Parks fetched 2026-11-09, sha256 8c3a5c338e5c |
| Park development fee, per dwelling unit parks | $1,500.00 per dwelling unit | $1,500 | Printed Effective 2025-09-17 Source · same, Parks fetched 2026-11-09, sha256 8c3a5c338e5c |
| Total listed | $24,545 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.