Huntsville, TX
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: Included: new residential building permit $0.75 per sq ft x 2,000 sq ft = $1,500 (computed; the schedule prints size bands, 0.85/0.80/0.75/0.65 per sq ft, and the 1,001-2,000 band is applied to the whole 2,000 sq ft house, an assumption), 3/4-inch water tap long side $1,500 (short side $1,200), 4-inch sewer tap long side $1,550 (short $1,000, manhole $1,600), sewer connection fee $200 (City of Huntsville FY 25-26 schedule amended Feb 19 2026). No water, sewer or other impact fee is posted in the schedule. Not included: water meter (not posted as a purchase price; set-only $300 applies when another entity taps), residential security deposit, trade permits, plan check. Searched 2026-11-09 (lane A).
Water/sewer provider: City of Huntsville
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| New residential building permit permit · computed | $0.75 per sq ft for the 1,001-2,000 sq ft band 2,000 sq ft heated | $1,500 | 0.75 x 2,000 = 1,500.00 (size band applied to the whole house; assumed) Effective 2026-02-19 Source · City of Huntsville FY 25-26 Fee Schedule (amended 02.19.2026), Building Permits (Residential) fetched 2026-11-09, sha256 029cc9a331de |
| Water tap, 3/4-inch, city crews, long side water · computed | $1,500 (short side $1,200) per tap | $1,500 | Printed long side; short side $1,200 Effective 2026-02-19 Source · City of Huntsville FY 25-26 Fee Schedule (amended 02.19.2026), Water Tapping Charge fetched 2026-11-09, sha256 029cc9a331de |
| Sewer tap, 4-inch, city crews, long side sewer · computed | $1,550 (short side $1,000; manhole in street $1,600) per tap | $1,550 | Printed long side; short side $1,000 Effective 2026-02-19 Source · City of Huntsville FY 25-26 Fee Schedule (amended 02.19.2026), Sewer Tapping Charge fetched 2026-11-09, sha256 029cc9a331de |
| Sewer connection fee sewer | $200 per connection | $200 | Printed Effective 2026-02-19 Source · City of Huntsville FY 25-26 Fee Schedule (amended 02.19.2026), Sewer Tapping Charge fetched 2026-11-09, sha256 029cc9a331de |
| Total listed | $4,750 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.