Padstake
Menu

Hewitt, TX

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$5,050listed total
Nonerank by 2025 new single-family permits

Not included: Included: new construction building permit $0.25 per sq ft under roof (per floor) x 2,400 sq ft = $600 ($320 minimum), water tap base fee $2,000 and 5/8-inch x 3/4-inch meter set $450 (plus meter box if needed), and 4-inch wastewater tap base fee $2,000 (City of Hewitt Master Fee Schedule FY 2026-2027; the taps are "base fee, quoted on a per-cost basis", so the final cost depends on a quote). No impact fee is posted. Not included: electrical, plumbing and mechanical new-construction permits ($0.10 per sq ft under roof each), cost of meter box, bore or street cut (minimum $1,000 base fee), plan review. Searched 2026-11-09 (lane A).

Water/sewer provider: City of Hewitt

LinePrinted ratePrototypeReceipt
New construction building permit
permit · computed
$0.25 per sq ft under roof (per floor), minimum $320
2,400 sq ft under roof (one floor; 2,000 heated + 400 garage)
$6000.25 x 2,400 = 600.00 (assumed 2,400 sq ft under roof on one floor)
Effective 2026-10-01
Source · City of Hewitt Master Fee Schedule FY 2026-2027, Permit Fees, New Construction
fetched 2026-11-09, sha256 e0ce85cc2a7d
Water tap, all water taps (base fee, quoted on a per-cost basis)
water
$2000 Base Fee - quoted on a per-cost basis
per tap
$2,000Printed base fee
Effective 2026-10-01
Source · City of Hewitt Master Fee Schedule FY 2026-2027, Utility Fees, Water Taps & Meter Set
fetched 2026-11-09, sha256 e0ce85cc2a7d
Water meter set, 5/8-inch x 3/4-inch
water
$450 + cost of meter box if needed
per meter
$450Printed
Effective 2026-10-01
Source · City of Hewitt Master Fee Schedule FY 2026-2027, Utility Fees
fetched 2026-11-09, sha256 e0ce85cc2a7d
Wastewater tap, 4-inch (base fee, quoted on a per-cost basis)
sewer
$2000 Base Fee - quoted on a per-cost basis
per tap
$2,000Printed base fee
Effective 2026-10-01
Source · City of Hewitt Master Fee Schedule FY 2026-2027, Utility Fees, Wastewater Taps & Service Connection Fees
fetched 2026-11-09, sha256 e0ce85cc2a7d
Total listed$5,050

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.