Harlingen, TX
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: From the City of Harlingen Code of Ordinances Ch 18 Fees on eCode360 (owner-approved host, read politely 2026-11-12; amended through Ord. 2026-41, Sept 2 2026): water facilities impact fee $1,044.00 and wastewater facilities impact fee $1,599.00 for a 3/4-inch meter inside the city (outside city $1,160.00 and $1,777.00; larger meters cost more), and the residential building permit at $0.25 per sq ft of total buildable area, computed on an assumed 2,400 sq ft (labelled). This replaces the 2019 permit schedule (src 1033). Not included: Harlingen Waterworks System tap and meter fees (not located), plan review, plumbing/electrical/mechanical permits, any street or drainage fee.
Water/sewer provider: City of Harlingen (water, wastewater impact fees)
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water facilities impact fee, 3/4-inch meter, inside city water | $1,044.00 per connection (range $1,044.00 for 3/4-inch to $339,248.00 for 10-inch; outside city $1,160.00) | $1,044 | Printed (sec. 48-47) Effective 2026-09-02 Source · Harlingen Code Ch 18 Fees (ecode360, amended through Ord. 2026-41 of 9/2/2026; read 2026-11-12), sec. 48-47 fetched 2026-11-12, sha256 b85c49a91b8d |
| Wastewater facilities impact fee, 3/4-inch meter, inside city sewer | $1,599.00 per connection (outside city $1,777.00) | $1,599 | Printed (sec. 48-47) Effective 2026-09-02 Source · Harlingen Code Ch 18 Fees (ecode360, amended through Ord. 2026-41 of 9/2/2026; read 2026-11-12), sec. 48-47 fetched 2026-11-12, sha256 b85c49a91b8d |
| Residential building permit, $0.25 per sq ft of total buildable area permit · computed | $0.25 per sq ft | $600 | $0.25 x 2,400 sq ft (assumed 2,000 heated + 400 garage; total buildable area) Effective 2026-09-02 Source · Harlingen Code Ch 18 Fees (ecode360, amended through Ord. 2026-41 of 9/2/2026; read 2026-11-12), sec. 103 building permit fees fetched 2026-11-12, sha256 b85c49a91b8d |
| Total listed | $3,243 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.