Harlingen, TX

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$3,243listed total
Nonerank by 2025 new single-family permits

Not included: From the City of Harlingen Code of Ordinances Ch 18 Fees on eCode360 (owner-approved host, read politely 2026-11-12; amended through Ord. 2026-41, Sept 2 2026): water facilities impact fee $1,044.00 and wastewater facilities impact fee $1,599.00 for a 3/4-inch meter inside the city (outside city $1,160.00 and $1,777.00; larger meters cost more), and the residential building permit at $0.25 per sq ft of total buildable area, computed on an assumed 2,400 sq ft (labelled). This replaces the 2019 permit schedule (src 1033). Not included: Harlingen Waterworks System tap and meter fees (not located), plan review, plumbing/electrical/mechanical permits, any street or drainage fee.

Water/sewer provider: City of Harlingen (water, wastewater impact fees)

LinePrinted ratePrototypeReceipt
Water facilities impact fee, 3/4-inch meter, inside city
water
$1,044.00
per connection (range $1,044.00 for 3/4-inch to $339,248.00 for 10-inch; outside city $1,160.00)
$1,044Printed (sec. 48-47)
Effective 2026-09-02
Source · Harlingen Code Ch 18 Fees (ecode360, amended through Ord. 2026-41 of 9/2/2026; read 2026-11-12), sec. 48-47
fetched 2026-11-12, sha256 b85c49a91b8d
Wastewater facilities impact fee, 3/4-inch meter, inside city
sewer
$1,599.00
per connection (outside city $1,777.00)
$1,599Printed (sec. 48-47)
Effective 2026-09-02
Source · Harlingen Code Ch 18 Fees (ecode360, amended through Ord. 2026-41 of 9/2/2026; read 2026-11-12), sec. 48-47
fetched 2026-11-12, sha256 b85c49a91b8d
Residential building permit, $0.25 per sq ft of total buildable area
permit · computed
$0.25
per sq ft
$600$0.25 x 2,400 sq ft (assumed 2,000 heated + 400 garage; total buildable area)
Effective 2026-09-02
Source · Harlingen Code Ch 18 Fees (ecode360, amended through Ord. 2026-41 of 9/2/2026; read 2026-11-12), sec. 103 building permit fees
fetched 2026-11-12, sha256 b85c49a91b8d
Total listed$3,243

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.