Padstake
Menu

Harker Heights, TX

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$7,133listed total
Nonerank by 2025 new single-family permits

Not included: Included: wastewater impact fee 3/4-inch meter $6,133 (the schedule prints an Adopted 2022 table at $6,133 and an Adopted 2024 table at $2,822; the city page says the wastewater impact fee applies in a limited service area, so the highest is the headline with the range on the line), residential new permit $0.10 per sq ft under roof x 2,400 sq ft + $10 tech fee = $250 (includes electrical, mechanical, plumbing, CO), sewer tap $375 and water meter tap $375 for new property (City of Harker Heights fee schedule Oct 1 2026 to Sept 30 2027). No water impact fee is posted. Not included: materials and street cut or road bore charges, estimated-cost deposit before taps, water deposit. Searched 2026-11-09 (lane A).

Water/sewer provider: City of Harker Heights

LinePrinted ratePrototypeReceipt
Wastewater impact fee, 3/4-inch meter
impact · computed
$6,133.00 (Adopted 2022 table); $2,822.00 (Adopted 2024 table)
per service unit, paid at building permit issuance
$6,133Highest printed table shown as headline; the schedule prints two wastewater tables (2022 and 2024)
Effective 2026-10-01
Source · City of Harker Heights Fee Schedule Oct 1 2026 to Sept 30 2027, Development and Planning, Impact Fees - Wastewater
fetched 2026-11-09, sha256 59d6ba229985
Residential new permit, one and two dwellings (includes CO, electrical, mechanical, plumbing, structure)
permit · computed
$0.10 per sq ft under roof + $10.00 tech fee
2,400 sq ft under roof (2,000 heated + 400 garage)
$2500.10 x 2,400 + 10.00 = 250.00 (assumed 2,400 sq ft)
Effective 2026-10-01
Source · City of Harker Heights Fee Schedule Oct 1 2026 to Sept 30 2027, Residential - New
fetched 2026-11-09, sha256 59d6ba229985
Sewer tap, new property
sewer
$375.00
per tap
$375Printed
Effective 2026-10-01
Source · City of Harker Heights Fee Schedule Oct 1 2026 to Sept 30 2027, Public Works, Tap Fees
fetched 2026-11-09, sha256 59d6ba229985
Water meter tap, new property (3/4-inch meter installed)
water
$375.00
per tap
$375Printed
Effective 2026-10-01
Source · City of Harker Heights Fee Schedule Oct 1 2026 to Sept 30 2027, Public Works, Tap Fees
fetched 2026-11-09, sha256 59d6ba229985
Total listed$7,133

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.