Padstake
Menu

Greenville, TX

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$15,070.94listed total
Nonerank by 2025 new single-family permits

Not included: Fee Schedule (greenvilletx.gov DocumentCenter 934, src 436; undated, current per permits page) and Impact Fee Ordinance 22-040 of April 12, 2022 with the 2021 studies (ci.greenville.tx.us, src 438, read from rendered pages). 2,000 sq ft heated assumed. Taps shown without street cut; with street cut water $3,050 and sewer $2,900. The ordinance amounts are the 2022 collection rates; later amendments were not found. Not included: separate trade permits if not covered by the 10% trades add-on, driveway/sidewalk permit $50, foundation-only fee, utility deposits. Water and sewer charges are paid to GEUS. Lane A 2026-11-09.

Water/sewer provider: GEUS / City of Greenville

LinePrinted ratePrototypeReceipt
Single family home building permit including 10% for trades
permit · computed
$0.50 per square foot plus 10% for trades
per sq ft plus 10%
$1,1000.50 x 2,000 sq ft heated = 1,000.00; plus 10% = 1,100.00
Effective n/a
Source · Fee Schedule page 1
fetched 2026-11-09, sha256 8a77a277f85d
Water tap, 3/4-inch, without street cut (with street cut $3,050)
water
$1,750.00
per tap
$1,750Printed
Effective n/a
Source · Fee Schedule page 1
fetched 2026-11-09, sha256 8a77a277f85d
Sewer tap, 4-inch or less, without street cut (with street cut $2,900)
sewer
$1,600.00
per tap
$1,600Printed
Effective n/a
Source · Fee Schedule page 1
fetched 2026-11-09, sha256 8a77a277f85d
Meter set
water
$525.00
per meter
$525Printed
Effective n/a
Source · Fee Schedule page 1
fetched 2026-11-09, sha256 8a77a277f85d
All districts park fee
parks
$584.69
per dwelling
$584.69Printed
Effective n/a
Source · Fee Schedule page 1
fetched 2026-11-09, sha256 8a77a277f85d
Water impact fee collection rate, 3/4-inch meter
water
$1,657
per meter, by size
$1,657Printed
Effective n/a
Source · Ordinance 22-040 Sec 26.02.007(A)
fetched 2026-11-09, sha256 acc6700b143e
Wastewater impact fee collection rate, 3/4-inch meter
sewer
$1,913
per meter, by size
$1,913Printed
Effective n/a
Source · Ordinance 22-040 Sec 26.02.007(B)
fetched 2026-11-09, sha256 acc6700b143e
Roadway impact fee, single-family detached, collection rate $1,225 per vehicle-mile (Service Areas 1, 2, 3 same)
transportation · computed
$1,225 per vehicle-mile
per vehicle-mile x 4.85 per dwelling unit
$5,941.251,225 x 4.85 = 5,941.25
Effective n/a
Source · Sec 26.02.007(C); 4.85 vehicle-miles from the 2021 Roadway Impact Fee Study sample calculation
fetched 2026-11-09, sha256 acc6700b143e
Total listed$15,070.94

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.