Grand Prairie, TX
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: water tap per-foot charge ($9.00 per foot over 35 feet), wastewater tap over 35 feet or 10 feet deep, the separate $150.00 meter charge that applies to existing taps, the disaster warning siren fee (per platted acre, set by the latest bid; not a per-home amount), grading/drainage fees (not required for new single-family permits unless a plat directs it), engineering construction permit (4% of work cost). Grand Prairie prints no roadway or park impact fee in this schedule. Water and wastewater impact fees use the South Sector (higher); range shown. Source: Unified Development Code Article 22 Fee Schedule, last update Sept 2 2025.
Water/sewer provider: City of Grand Prairie
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water impact fee, 3/4-inch meter (South Sector) water | $7,014.00 (South Sector); North $2,567.00 per meter, by size and sector | $7,014 | Rule: the rate depends on the sector (North or South); the South sector has the higher rate and is used. North sector: water $2,567.00, wastewater $1,264.50. Effective 2025-09-02 Source · Sec. 22.3.16, Schedule 22.3-1a, p.22-26 fetched 2026-11-07, sha256 f8b9577e2e98 |
| Wastewater impact fee, 3/4-inch meter (South Sector) sewer | $2,436.00 (South Sector); North $1,264.50 per meter, by size and sector | $2,436 | Rule: the rate depends on the sector (North or South); the South sector has the higher rate and is used. North sector: water $2,567.00, wastewater $1,264.50. Effective 2025-09-02 Source · Sec. 22.3.16, Schedule 22.3-1a, p.22-26 fetched 2026-11-07, sha256 f8b9577e2e98 |
| New single-family building permit (includes building, electrical, plumbing, mechanical) permit | $1,000.00 New Single Family or Two-Family Dwelling per dwelling | $1,000 | Printed; Sec. 22.2.19 says the new building permit fee includes all trades Effective 2025-09-02 Source · Sec. 22.2.13, p.22-8 fetched 2026-11-07, sha256 f8b9577e2e98 |
| Plan review, new single-family dwelling permit | $100.00 per dwelling | $100 | Printed Effective 2025-09-02 Source · Sec. 22.2.13, p.22-8 fetched 2026-11-07, sha256 f8b9577e2e98 |
| Water tap, 3/4-inch tap with 3/4-inch meter water | $897.78 (plus $9.00 per foot of service over 35 feet; 60 feet maximum) per tap | $897.78 | Printed base fee; the per-foot add-on depends on the lot and is not included Effective 2025-09-02 Source · Sec. 22.4.3, p.22-28 fetched 2026-11-07, sha256 f8b9577e2e98 |
| Wastewater tap, under 35 feet long and under 10 feet deep sewer | $1,250.00 per tap | $1,250 | Printed Effective 2025-09-02 Source · Sec. 22.4.3, p.22-28 fetched 2026-11-07, sha256 f8b9577e2e98 |
| Total listed | $12,697.78 |
Fee-change calendar
- None recorded