Padstake
Menu

Decatur, TX

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
Nonerank by 2025 new single-family permits

Impact fees verified. Not a full total. Included: water impact fee $4,780 and wastewater impact fee $9,078 for a 3/4-inch meter (the schedule labels these maximum assessable impact fees; they are the amounts printed in the fee schedule), single-family park fees $1,053.54, residential new-construction permit $.94 per sq ft under roof x 2,400 sq ft = $2,256 (includes MEP; computed) and plan review 30% = $676.80, 3/4-inch water tap $600, 3/4-inch meter $450, sewer tap $750 (City of Decatur Ordinance 2026-09-29, effective Oct 1 2026). Not included: roadway impact fee (maximum $2,967 per service unit per vehicle-mile, needs a trip calculation, not computable for a house), technology fee $50 on projects over 2,000 sq ft, meter box ($35 light / $150 heavy), $150 street cut or bore surcharge, water deposit. Searched 2026-11-09 (lane A).

Water/sewer provider: City of Decatur

LinePrinted ratePrototypeReceipt
Water impact fee, 3/4-inch PD meter (maximum assessable, as printed)
impact
$4,780
per service unit
$4,780Printed
Effective 2026-10-01
Source · City of Decatur Ordinance 2026-09-29, Exhibit A Schedule of Fees (effective 10/1/2026), Table 5 Impact Fees
fetched 2026-11-09, sha256 4d80533e64fc
Wastewater impact fee, 3/4-inch PD meter (maximum assessable, as printed)
impact
$9,078
per service unit
$9,078Printed
Effective 2026-10-01
Source · City of Decatur Ordinance 2026-09-29, Exhibit A Schedule of Fees (effective 10/1/2026), Table 5 Impact Fees
fetched 2026-11-09, sha256 4d80533e64fc
Single-family park fees (fee in lieu $423.90 + development fee $629.64)
impact · computed
$1,053.54
per dwelling unit
$1,053.54423.90 + 629.64 = 1,053.54
Effective 2026-10-01
Source · City of Decatur Ordinance 2026-09-29, Exhibit A Schedule of Fees (effective 10/1/2026), Parkland Dedication
fetched 2026-11-09, sha256 4d80533e64fc
Residential new construction permit (includes building, mechanical, electrical, plumbing)
permit · computed
$.94 per sq ft of floor area under roof
2,400 sq ft under roof (2,000 heated + 400 garage)
$2,2560.94 x 2,400 = 2,256.00 (assumed 2,400 sq ft)
Effective 2026-10-01
Source · City of Decatur Ordinance 2026-09-29, Exhibit A Schedule of Fees (effective 10/1/2026), Residential Review Fees
fetched 2026-11-09, sha256 4d80533e64fc
Plan review
permit · computed
30% of building permit fee
30% of 2,256.00
$676.800.30 x 2,256.00 = 676.80
Effective 2026-10-01
Source · City of Decatur Ordinance 2026-09-29, Exhibit A Schedule of Fees (effective 10/1/2026), Residential Review Fees
fetched 2026-11-09, sha256 4d80533e64fc
Water tap, 3/4-inch
water
$600.00 (+$150 if street cut or bore)
per tap
$600Printed
Effective 2026-10-01
Source · City of Decatur Ordinance 2026-09-29, Exhibit A Schedule of Fees (effective 10/1/2026), Water & Sewer Taps
fetched 2026-11-09, sha256 4d80533e64fc
Water meter, 3/4-inch PD
water
$450.00
per meter
$450Printed
Effective 2026-10-01
Source · City of Decatur Ordinance 2026-09-29, Exhibit A Schedule of Fees (effective 10/1/2026), Water & Sewer Meter
fetched 2026-11-09, sha256 4d80533e64fc
Sewer tap
sewer
$750.00 (+$150 if street cut or bore)
per tap
$750Printed
Effective 2026-10-01
Source · City of Decatur Ordinance 2026-09-29, Exhibit A Schedule of Fees (effective 10/1/2026), Water & Sewer Taps
fetched 2026-11-09, sha256 4d80533e64fc

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.