Padstake
Menu

College Station, TX

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$18,697.06listed total
109rank by 2025 new single-family permits

Not included: Fee Schedule updated Sept 29, 2025 with rates effective 1/1/2026 (cstx.gov, src 298; water/wastewater impact sheet src 299). Roadway shown for highest service area D; range A-D $1,876.24-$5,692.64. 2,000 sq ft heated assumed. Not included: sewer tap/connection (no amount posted), plumbing/electrical/mechanical permits, irrigation, solar. Park fee is collected at final plat. Lane A 2026-11-08.

Water/sewer provider: City of College Station

LinePrinted ratePrototypeReceipt
Building permit, new single-family
permit · computed
$0.74 per square foot
per sq ft
$1,4800.74 x 2,000 sq ft heated = 1,480.00
Effective 2026-01-01
Source · Fee schedule page 3
fetched 2026-11-08, sha256 f1eb9dec9024
Water service connection fee, 5/8-inch
water
$643.42
per connection
$643.42Printed
Effective 2026-01-01
Source · page 7
fetched 2026-11-08, sha256 f1eb9dec9024
Water impact fee, residential 5/8-inch, from 1/1/2026
water
$2,325
per meter, by size
$2,325Printed
Effective 2026-01-01
Source · page 4
fetched 2026-11-08, sha256 f1eb9dec9024
Wastewater impact fee, residential 5/8-inch
sewer
$3,300
per meter, by size
$3,300Printed
Effective 2026-01-01
Source · page 4
fetched 2026-11-08, sha256 f1eb9dec9024
Parkland dedication fee in lieu plus park development fee, single-family
parks
$5,256
per dwelling unit (collected at final plat)
$5,256Printed (1,106 + 4,150)
Effective 2026-01-01
Source · page 8
fetched 2026-11-08, sha256 f1eb9dec9024
Roadway impact fee, single-family detached, service area D (A $1,876.24; B $4,030.72; C $4,741.36)
transportation
$5,692.64
per dwelling unit, by service area
$5,692.64Printed
Effective 2026-01-01
Source · page 9
fetched 2026-11-08, sha256 f1eb9dec9024
Total listed$18,697.06

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.