Padstake
Menu

Bullard town, TX

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$2,060listed total
Nonerank by 2025 new single-family permits

Not included: Included: residential building permit $15 per 100 sq ft x 2,400 sq ft under roof = $360 (computed; under roof counts heated and garage), certificate of occupancy $50, water tap $450, 3/4-inch water meter set $550, sewer tap $650 (City of Bullard Construction Packet, June 2026). No water, sewer or other impact fee is posted. Not included: electrical ($5 per 100 sq ft), plumbing ($4), gas ($1) and HVAC ($5) trade permits, inspection fee $55 per trip, plan review $75 per hour, excavation permit $150. Searched 2026-11-09 (lane A).

Water/sewer provider: City of Bullard

LinePrinted ratePrototypeReceipt
Residential building permit, new
permit · computed
$15 per 100 sq ft ($100 minimum); under-roof area incl. garage
2,400 sq ft under roof (2,000 heated + 400 garage)
$36015 x 24 = 360.00 (assumed 2,400 sq ft under roof)
Effective 2026-06-01
Source · City of Bullard Construction Packet (June 2026), Building permit and other fees, page 12 item 1
fetched 2026-11-09, sha256 155fa3643d6f
Certificate of occupancy, residential
permit
$50.00
per dwelling
$50Printed
Effective 2026-06-01
Source · City of Bullard Construction Packet (June 2026), Building permit and other fees, page 12 item 6
fetched 2026-11-09, sha256 155fa3643d6f
Water tap fee
water
$450.00
per tap
$450Printed
Effective 2026-06-01
Source · City of Bullard Construction Packet (June 2026), Building permit and other fees, page 13 item 11
fetched 2026-11-09, sha256 155fa3643d6f
Water meter set, 3/4-inch
water
$550.00
per meter, by size
$550Printed
Effective 2026-06-01
Source · City of Bullard Construction Packet (June 2026), Building permit and other fees, page 13 item 13
fetched 2026-11-09, sha256 155fa3643d6f
Sewer tap fee
sewer
$650.00
per tap
$650Printed
Effective 2026-06-01
Source · City of Bullard Construction Packet (June 2026), Building permit and other fees, page 13 item 12
fetched 2026-11-09, sha256 155fa3643d6f
Total listed$2,060

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.