Bullard town, TX
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: Included: residential building permit $15 per 100 sq ft x 2,400 sq ft under roof = $360 (computed; under roof counts heated and garage), certificate of occupancy $50, water tap $450, 3/4-inch water meter set $550, sewer tap $650 (City of Bullard Construction Packet, June 2026). No water, sewer or other impact fee is posted. Not included: electrical ($5 per 100 sq ft), plumbing ($4), gas ($1) and HVAC ($5) trade permits, inspection fee $55 per trip, plan review $75 per hour, excavation permit $150. Searched 2026-11-09 (lane A).
Water/sewer provider: City of Bullard
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Residential building permit, new permit · computed | $15 per 100 sq ft ($100 minimum); under-roof area incl. garage 2,400 sq ft under roof (2,000 heated + 400 garage) | $360 | 15 x 24 = 360.00 (assumed 2,400 sq ft under roof) Effective 2026-06-01 Source · City of Bullard Construction Packet (June 2026), Building permit and other fees, page 12 item 1 fetched 2026-11-09, sha256 155fa3643d6f |
| Certificate of occupancy, residential permit | $50.00 per dwelling | $50 | Printed Effective 2026-06-01 Source · City of Bullard Construction Packet (June 2026), Building permit and other fees, page 12 item 6 fetched 2026-11-09, sha256 155fa3643d6f |
| Water tap fee water | $450.00 per tap | $450 | Printed Effective 2026-06-01 Source · City of Bullard Construction Packet (June 2026), Building permit and other fees, page 13 item 11 fetched 2026-11-09, sha256 155fa3643d6f |
| Water meter set, 3/4-inch water | $550.00 per meter, by size | $550 | Printed Effective 2026-06-01 Source · City of Bullard Construction Packet (June 2026), Building permit and other fees, page 13 item 13 fetched 2026-11-09, sha256 155fa3643d6f |
| Sewer tap fee sewer | $650.00 per tap | $650 | Printed Effective 2026-06-01 Source · City of Bullard Construction Packet (June 2026), Building permit and other fees, page 13 item 12 fetched 2026-11-09, sha256 155fa3643d6f |
| Total listed | $2,060 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.