Buda, TX
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: Source: City of Buda Code of Ordinances on eCode360 (owner-approved host, read politely 2026-11-11): Ch 16 Art 16.02 Div 2 (impact fees: water 7,188 and wastewater 5,239 per LUE for plats recorded after Jan 7 2026; older plats pay older rates), Appendix A Fee Schedule Art A4.00 (building/development) and A11.00 (utilities), Appendix A as amended by Ordinance 2026-31 adopted 9/15/2026. 2,000 sq ft heated house assumed. Not included: roadway impact fee (none found in Ch 16), other-trade/flatwork permits, site/plat review, technology fee, tree and sidewalk fees, irrigation, outside-city rates, impact fees for other meter sizes. Fee amounts in the Article A4.00 online text still show the pre-2026 impact rates in places; the Chapter 16 rates were used.
Water/sewer provider: City of Buda
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water impact fee, one service unit (5/8 or 3/4 inch meter) water | $7,188.00 per LUE (plats recorded after January 7, 2026) per service unit | $7,188 | Printed; one unit for a 3/4-inch meter Effective 2026-01-07 Source · Ch 16, Art 16.02, Div 2 rate table fetched 2026-11-11, sha256 d9aadf927f3e |
| Wastewater impact fee, one service unit sewer | $5,239.00 per LUE (plats recorded after January 7, 2026) per service unit | $5,239 | Printed Effective 2026-01-07 Source · Ch 16, Art 16.02, Div 2 rate table fetched 2026-11-11, sha256 d9aadf927f3e |
| Water connection fee, 5/8 or 3/4 inch, inside city water | $400.00 + cost of meter each | $400 | Printed ($400.00); meter listed separately Effective 2026-09-15 Source · Apx A, Art A11.00 (p) fetched 2026-11-11, sha256 e56cb04fd625 |
| 3/4-inch water meter water | $375.00 for 5/8" or 3/4" meter each | $375 | Printed Effective 2026-09-15 Source · Apx A, Art A11.00 (r) fetched 2026-11-11, sha256 e56cb04fd625 |
| Wastewater connection fee, 4 inch, inside city sewer | $450.00 each | $450 | Printed Effective 2026-09-15 Source · Apx A, Art A11.00 (q) fetched 2026-11-11, sha256 e56cb04fd625 |
| Residential new construction plan review permit · computed | $500.00 + $0.25 per square foot per sq ft | $1,000 | $500.00 + $0.25 x 2,000 sq ft heated = $1,000.00 Effective 2026-09-15 Source · Apx A, Art A4.00 (o)(1) fetched 2026-11-11, sha256 85cfbf70aeed |
| Residential building inspection permit | $150.00 each | $150 | Printed Effective 2026-09-15 Source · Apx A, Art A4.00 (p)(1) fetched 2026-11-11, sha256 85cfbf70aeed |
| Single trade permits: mechanical, electrical, plumbing (3 x $150.00) permit · computed | $150.00 each, residential each | $450 | 3 x $150.00 = $450.00 Effective 2026-09-15 Source · Apx A, Art A4.00 (l)(1) fetched 2026-11-11, sha256 85cfbf70aeed |
| Certificate of occupancy permit | $250.00 each | $250 | Printed Effective 2026-09-15 Source · Apx A, Art A4.00 (e) fetched 2026-11-11, sha256 85cfbf70aeed |
| Online permit fee (MyPermitNow) permit | $20.00 per application per application | $20 | Printed Effective 2026-09-15 Source · Apx A, Art A4.00 (mm) fetched 2026-11-11, sha256 85cfbf70aeed |
| Parkland dedication fee in lieu, per residential unit parks | $2,000.00 per unit per unit | $2,000 | Printed Effective 2026-09-15 Source · Apx A, Art A4.00 (rr)(1) fetched 2026-11-11, sha256 85cfbf70aeed |
| Parkland improvement fee in lieu, per residential unit parks | $1,500.00 per unit per unit | $1,500 | Printed Effective 2026-09-15 Source · Apx A, Art A4.00 (rr)(2) fetched 2026-11-11, sha256 85cfbf70aeed |
| Total listed | $19,022 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.