Bastrop, TX
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. Included: water and wastewater impact fees (Ordinance 2025-08), water and sewer connection/tap fees, residential building permit, plan review and inspection (Master Fee Schedule 4/28/26). Missing: roadway impact fee (Chapter 13 Article 13.12, Ord. 2025-63): rate is per vehicle-mile service unit (single-family 3.68 veh-mi per dwelling), depends on service area A/B and plat date with a phased collection table whose scan is garbled, so no amount is stated; also not included: administration/technology fees that apply only on the sliding scale, trade permits, line extensions at developer cost. Square footage assumed 2,000 heated. Searched 2026-11-09 (lane A).
Water/sewer provider: City of Bastrop
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water impact fee, 3/4-inch meter (1 service unit), all service areas water | $8,182.00 per service unit | $8,182 | Printed, 1 service unit x 8,182 Effective 2025-03-11 Source · Tap and Impact Fee form, Ordinance 2025-08 fetched 2026-11-09, sha256 391b6a1988a0 |
| Wastewater impact fee, 3/4-inch meter (1 service unit), all service areas sewer | $8,625.00 per service unit | $8,625 | Printed, 1 service unit x 8,625 Effective 2025-03-11 Source · Tap and Impact Fee form, Ordinance 2025-08 fetched 2026-11-09, sha256 391b6a1988a0 |
| Water connection and tapping fee, 5/8 x 3/4-inch meter, inside city limits water | $300.00 per meter, by size | $300 | Printed (outside city limits $400) Effective 2025-03-11 Source · Tap and Impact Fee form fetched 2026-11-09, sha256 391b6a1988a0 |
| Wastewater connection and tapping fee, 4-inch tap sewer | $300.00 per tap | $300 | Printed Effective 2025-03-11 Source · Tap and Impact Fee form fetched 2026-11-09, sha256 391b6a1988a0 |
| New residential building permit, 1,501 to 5,000 sq ft permit · computed | $1500 plus $0.25 per sf base plus per sq ft | $2,000 | 1,500 + 0.25 x 2,000 sq ft heated = 2,000 Effective 2026-04-28 Source · Master Fee Schedule (4/28/26), Building code - Residential Construction fetched 2026-11-09, sha256 4f2a5870d130 |
| Residential plan review fee permit · computed | 25% of New Construction Permit Fee percent of permit fee | $500 | 25% x 2,000 = 500 Effective 2026-04-28 Source · Master Fee Schedule (4/28/26) fetched 2026-11-09, sha256 4f2a5870d130 |
| New residential inspection fee (with permit) permit · computed | 45% of New Construction Permit Fee percent of permit fee | $900 | 45% x 2,000 = 900 Effective 2026-04-28 Source · Master Fee Schedule (4/28/26) fetched 2026-11-09, sha256 4f2a5870d130 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.