Austin, TX
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. Included: Austin Water impact fees (capital recovery) $4,800 water and $2,900 wastewater per service unit, 3/4-inch meter = 1.5 service units ($7,200 + $4,350 = $11,550), lots platted after Oct 1 2023; 3/4-inch meter $138.86, tap $200.22 and inspection $107.90 (Austin Water schedule eff 10/1/2026). Not included: Development Services residential plan review and building permit (schedule only on a share host that disallows automated access), fire and other fees, drainage and transportation. Verified 2026-11-09 (main).
Water/sewer provider: Austin Water
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water impact fee (capital recovery fee), lots platted after Oct 1 2023 impact · computed | $4,800 per service unit per service unit; 3/4-inch meter = 1.5 service units | $7,200 | 4,800 x 1.5 = 7,200 (rule: prototype lot assumed platted after 2023-10-01) Effective 2026-10-01 Source · Rates and Fees page, Impact Fees table; service units from Utility Permitting table (src 12) fetched 2026-11-06, sha256 23da0bf75a1e |
| Wastewater impact fee (capital recovery fee), lots platted after Oct 1 2023 impact · computed | $2,900 per service unit per service unit; 3/4-inch meter = 1.5 service units | $4,350 | 2,900 x 1.5 = 4,350 (same plat-date rule) Effective 2026-10-01 Source · Rates and Fees page, Impact Fees table; service units from Utility Permitting table (src 12) fetched 2026-11-06, sha256 23da0bf75a1e |
| Water meter cost, 3/4-inch water | $138.86 per meter, by size | $138.86 | Printed Effective 2026-10-01 Source · Utility Permitting Fees table FY2026-27 fetched 2026-11-06, sha256 8a0f0757f77f |
| Tap and reconnection fee, 3/4-inch water | $200.22 per meter, by size | $200.22 | Printed Effective 2026-10-01 Source · Utility Permitting Fees table FY2026-27 fetched 2026-11-06, sha256 8a0f0757f77f |
| Austin Water inspection fee (residential meters) water | $107.90 per residential meter | $107.90 | Printed Effective 2026-10-01 Source · Utility Permitting Fees table FY2026-27 fetched 2026-11-06, sha256 8a0f0757f77f |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.