Springfield, TN
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: Springfield TN: water SDC 635 and wastewater SDC 4,778 (3/4 inch meter), general government 599, fire 555, parks 396, police 380, transportation 2,625 (single family), water tap 700 + installation 1,300 (long side; 1,100 short side), wastewater tap 700 + installation 900 (standard 6 inch), from the city Tap Fees and System Development Charge pages (SDC fees as of Jan 1 2023), and the building permit 0.0047 x construction valuation (computed 380,268 = 1,787.26) plus new HVAC 0.10 per heated sq ft (200), from Ordinances 21-03 and 21-04. NOT included: Robertson County adequate facilities tax (receipt required for building permit), "plus cost" extras on installations, plumbing/electrical permits, deposits. Ordinance 26-23 rate changes not read. 2026-11-09 lane B.
Water/sewer provider:
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water system development charge, 0.75 displacement meter water | $635 3/4 inch meter | $635 | Printed Effective 2023-01-01 Source · Springfield TN System Development Charge page (fees as of Jan 1 2023), Water/Wastewater table fetched 2026-11-09, sha256 fe02373d3ce2 |
| Wastewater system development charge, 0.75 displacement meter sewer | $4,778 3/4 inch meter | $4,778 | Printed Effective 2023-01-01 Source · Springfield TN System Development Charge page (fees as of Jan 1 2023), Water/Wastewater table fetched 2026-11-09, sha256 fe02373d3ce2 |
| Water tap fee, equivalent single-family dwelling connection water | $700 per connection | $700 | Printed Effective n/a Source · Springfield TN Tap Fees page, Tap Fees fetched 2026-11-09, sha256 41c08dda73f1 |
| Water service installation, standard 3/4 inch residential (city-installed) water · computed | $1,100.00 short-side | $1,300.00 long-side plus cost 3/4 inch standard service | $1,300 | Printed (long-side, the higher) Effective n/a Source · Springfield TN Tap Fees page, Water fetched 2026-11-09, sha256 41c08dda73f1 |
| Wastewater tap fee, equivalent single-family dwelling connection sewer | $700 per connection | $700 | Printed Effective n/a Source · Springfield TN Tap Fees page, Tap Fees fetched 2026-11-09, sha256 41c08dda73f1 |
| Wastewater service installation, standard 6 inch (city-installed) sewer | $900.00 plus cost standard 6 inch service | $900 | Printed Effective n/a Source · Springfield TN Tap Fees page, Wastewater fetched 2026-11-09, sha256 41c08dda73f1 |
| General Government system development charge, single family general | $599 per single family unit | $599 | Printed Effective 2023-01-01 Source · Springfield TN System Development Charge page (fees as of Jan 1 2023), Residential table fetched 2026-11-09, sha256 fe02373d3ce2 |
| Fire system development charge, single family fire | $555 per single family unit | $555 | Printed Effective 2023-01-01 Source · Springfield TN System Development Charge page (fees as of Jan 1 2023), Residential table fetched 2026-11-09, sha256 fe02373d3ce2 |
| Parks system development charge, single family parks | $396 per single family unit | $396 | Printed Effective 2023-01-01 Source · Springfield TN System Development Charge page (fees as of Jan 1 2023), Residential table fetched 2026-11-09, sha256 fe02373d3ce2 |
| Police system development charge, single family police | $380 per single family unit | $380 | Printed Effective 2023-01-01 Source · Springfield TN System Development Charge page (fees as of Jan 1 2023), Residential table fetched 2026-11-09, sha256 fe02373d3ce2 |
| Transportation system development charge, single family transportation | $2,625 per single family unit | $2,625 | Printed Effective 2023-01-01 Source · Springfield TN System Development Charge page (fees as of Jan 1 2023), Residential table fetched 2026-11-09, sha256 fe02373d3ce2 |
| New construction building permit permit · computed | gross square feet x average square foot construction cost (valuation table) x 0.0047 valuation $380,268 (ICC BVD convention; the city Exhibit B table is not in the posted file) | $1,787.26 | 380,268 x 0.0047 = 1787.26 Effective 2021-01-01 Source · Springfield TN Building Permit Fee Schedule (Ordinance 21-03 Exhibit A and Ordinance 21-04 Exhibit A, image-only PDF read from the rendered pages), New construction fee fetched 2026-11-09, sha256 06b1573b31f0 |
| New mechanical and HVAC systems installation, residential permit · computed | $0.10 per heated square foot (up to a maximum of $200.00 per 2,000 heated square feet) 2,000 sq ft heated | $200 | 0.10 x 2,000 = 200.00 Effective 2021-01-01 Source · Springfield TN Building Permit Fee Schedule (Ordinance 21-03 Exhibit A and Ordinance 21-04 Exhibit A, image-only PDF read from the rendered pages), Section 1 Residential Mechanical Permits fetched 2026-11-09, sha256 06b1573b31f0 |
| Total listed | $15,555.26 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.