Padstake
Menu

Springfield, TN

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$15,555.26listed total
Nonerank by 2025 new single-family permits

Not included: Springfield TN: water SDC 635 and wastewater SDC 4,778 (3/4 inch meter), general government 599, fire 555, parks 396, police 380, transportation 2,625 (single family), water tap 700 + installation 1,300 (long side; 1,100 short side), wastewater tap 700 + installation 900 (standard 6 inch), from the city Tap Fees and System Development Charge pages (SDC fees as of Jan 1 2023), and the building permit 0.0047 x construction valuation (computed 380,268 = 1,787.26) plus new HVAC 0.10 per heated sq ft (200), from Ordinances 21-03 and 21-04. NOT included: Robertson County adequate facilities tax (receipt required for building permit), "plus cost" extras on installations, plumbing/electrical permits, deposits. Ordinance 26-23 rate changes not read. 2026-11-09 lane B.

Water/sewer provider:

LinePrinted ratePrototypeReceipt
Water system development charge, 0.75 displacement meter
water
$635
3/4 inch meter
$635Printed
Effective 2023-01-01
Source · Springfield TN System Development Charge page (fees as of Jan 1 2023), Water/Wastewater table
fetched 2026-11-09, sha256 fe02373d3ce2
Wastewater system development charge, 0.75 displacement meter
sewer
$4,778
3/4 inch meter
$4,778Printed
Effective 2023-01-01
Source · Springfield TN System Development Charge page (fees as of Jan 1 2023), Water/Wastewater table
fetched 2026-11-09, sha256 fe02373d3ce2
Water tap fee, equivalent single-family dwelling connection
water
$700
per connection
$700Printed
Effective n/a
Source · Springfield TN Tap Fees page, Tap Fees
fetched 2026-11-09, sha256 41c08dda73f1
Water service installation, standard 3/4 inch residential (city-installed)
water · computed
$1,100.00 short-side | $1,300.00 long-side plus cost
3/4 inch standard service
$1,300Printed (long-side, the higher)
Effective n/a
Source · Springfield TN Tap Fees page, Water
fetched 2026-11-09, sha256 41c08dda73f1
Wastewater tap fee, equivalent single-family dwelling connection
sewer
$700
per connection
$700Printed
Effective n/a
Source · Springfield TN Tap Fees page, Tap Fees
fetched 2026-11-09, sha256 41c08dda73f1
Wastewater service installation, standard 6 inch (city-installed)
sewer
$900.00 plus cost
standard 6 inch service
$900Printed
Effective n/a
Source · Springfield TN Tap Fees page, Wastewater
fetched 2026-11-09, sha256 41c08dda73f1
General Government system development charge, single family
general
$599
per single family unit
$599Printed
Effective 2023-01-01
Source · Springfield TN System Development Charge page (fees as of Jan 1 2023), Residential table
fetched 2026-11-09, sha256 fe02373d3ce2
Fire system development charge, single family
fire
$555
per single family unit
$555Printed
Effective 2023-01-01
Source · Springfield TN System Development Charge page (fees as of Jan 1 2023), Residential table
fetched 2026-11-09, sha256 fe02373d3ce2
Parks system development charge, single family
parks
$396
per single family unit
$396Printed
Effective 2023-01-01
Source · Springfield TN System Development Charge page (fees as of Jan 1 2023), Residential table
fetched 2026-11-09, sha256 fe02373d3ce2
Police system development charge, single family
police
$380
per single family unit
$380Printed
Effective 2023-01-01
Source · Springfield TN System Development Charge page (fees as of Jan 1 2023), Residential table
fetched 2026-11-09, sha256 fe02373d3ce2
Transportation system development charge, single family
transportation
$2,625
per single family unit
$2,625Printed
Effective 2023-01-01
Source · Springfield TN System Development Charge page (fees as of Jan 1 2023), Residential table
fetched 2026-11-09, sha256 fe02373d3ce2
New construction building permit
permit · computed
gross square feet x average square foot construction cost (valuation table) x 0.0047
valuation $380,268 (ICC BVD convention; the city Exhibit B table is not in the posted file)
$1,787.26380,268 x 0.0047 = 1787.26
Effective 2021-01-01
Source · Springfield TN Building Permit Fee Schedule (Ordinance 21-03 Exhibit A and Ordinance 21-04 Exhibit A, image-only PDF read from the rendered pages), New construction fee
fetched 2026-11-09, sha256 06b1573b31f0
New mechanical and HVAC systems installation, residential
permit · computed
$0.10 per heated square foot (up to a maximum of $200.00 per 2,000 heated square feet)
2,000 sq ft heated
$2000.10 x 2,000 = 200.00
Effective 2021-01-01
Source · Springfield TN Building Permit Fee Schedule (Ordinance 21-03 Exhibit A and Ordinance 21-04 Exhibit A, image-only PDF read from the rendered pages), Section 1 Residential Mechanical Permits
fetched 2026-11-09, sha256 06b1573b31f0
Total listed$15,555.26

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.