Padstake
Menu

Rutherford County Unincorporated Area, TN

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
Nonerank by 2025 new single-family permits

Impact fees verified. Not a full total. School Facilities Tax $1.50 per sq ft of floor area (effective Oct 1, 2024; 2,000 sq ft heated assumed; paid before the certificate of occupancy), a county development tax counted here as the impact-type fee. Permit lines from the county residential permit fee schedule effective 7/1/2023 (the posted one; may have been revised): $0.70 per sq ft under beam (garage counted, 2,400 sq ft) and whole-house plumbing $175. NOT included: water and sewer (provided by cities, utility districts, not the county), mechanical permit ($35 per ton), plan review ($200 per the search summary, not on the fetched sheet), gas permit, development tax in cities of the county follows the same rate. Page never shows a total. 2026-11-09.

Water/sewer provider:

LinePrinted ratePrototypeReceipt
School Facilities Tax (development tax)
impact · computed
$1.50 per square foot of floor area
per sq ft of floor area, residential
$3,000$1.50 x 2,000 sq ft heated floor area (assumed) = 3,000.00
Effective 2024-10-01
Source · School Facilities Tax page, changes effective October 1, 2024
fetched 2026-11-09, sha256 e1befb60187d
New dwelling building permit
permit · computed
$0.70 per square foot under beam (includes finished/unfinished, conditioned/unconditioned)
per sq ft under beam
$1,680$0.70 x 2,400 sq ft (2,000 heated + 400 garage, all under beam) = 1,680.00
Effective 2023-07-01
Source · Rutherford County Residential Building Permit Fees, effective 7/1/2023
fetched 2026-11-09, sha256 42b7704e049c
Plumbing permit (whole house)
permit
$175.00
flat
$175Printed
Effective 2023-07-01
Source · Rutherford County Residential Building Permit Fees, effective 7/1/2023
fetched 2026-11-09, sha256 42b7704e049c

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.