Nashville-Davidson, TN
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. Water and sewer fees verified from Nashville Metro Water Services' Development Fee Schedule (March 10, 2026; page read visually): water capacity $1,375 and sewer capacity $2,300 per 350 GPD unit, and the county flow sheet (Projected Flow Examples) shows a single-family dwelling at 350 GPD = 1 unit, so one unit each; 3/4-inch water tap $525; 6-inch sewer connection $360. Davidson County has no development impact fee found. NOT included: Codes Department building permit fees (not found), stormwater capacity fee (separate worksheet), infill/CEBRA fees, private availability payment rules (30-100% up front). Page never shows a total. 2026-11-09.
Water/sewer provider:
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water capacity fee water | $1,375.00 per 350 GPD capacity unit; a single-family dwelling is 350 GPD = 1 unit | $1,375 | Printed; 1 unit x $1,375.00 Effective 2026-03-10 Source · Metro Water Services Development Fee Schedule (Fee Schedule as of March 10, 2026), Water/Sewer Capacity & Tap Fees (page read visually); flow per Projected Flow Examples (Single Family Dwelling 350 GPD) fetched 2026-11-09, sha256 72a2ae5d9e72 |
| Sewer capacity fee sewer | $2,300.00 per 350 GPD capacity unit; a single-family dwelling is 350 GPD = 1 unit | $2,300 | Printed; 1 unit x $2,300.00 Effective 2026-03-10 Source · Metro Water Services Development Fee Schedule (Fee Schedule as of March 10, 2026), Water/Sewer Capacity & Tap Fees (page read visually); flow per Projected Flow Examples (Single Family Dwelling 350 GPD) fetched 2026-11-09, sha256 72a2ae5d9e72 |
| Water tap fee, 3/4 inch water | $525.00 per 3/4 inch tap | $525 | Printed Effective 2026-03-10 Source · Metro Water Services Development Fee Schedule (Fee Schedule as of March 10, 2026), Water/Sewer Capacity & Tap Fees (page read visually); flow per Projected Flow Examples (Single Family Dwelling 350 GPD) fetched 2026-11-09, sha256 72a2ae5d9e72 |
| Sewer tap fee, 6 inch connection sewer | $360.00 per 6 inch sewer connection | $360 | Printed Effective 2026-03-10 Source · Metro Water Services Development Fee Schedule (Fee Schedule as of March 10, 2026), Water/Sewer Capacity & Tap Fees (page read visually); flow per Projected Flow Examples (Single Family Dwelling 350 GPD) fetched 2026-11-09, sha256 72a2ae5d9e72 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.