Nashville-Davidson, TN

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
Nonerank by 2025 new single-family permits

Impact fees verified. Not a full total. Water and sewer fees verified from Nashville Metro Water Services' Development Fee Schedule (March 10, 2026; page read visually): water capacity $1,375 and sewer capacity $2,300 per 350 GPD unit, and the county flow sheet (Projected Flow Examples) shows a single-family dwelling at 350 GPD = 1 unit, so one unit each; 3/4-inch water tap $525; 6-inch sewer connection $360. Davidson County has no development impact fee found. NOT included: Codes Department building permit fees (not found), stormwater capacity fee (separate worksheet), infill/CEBRA fees, private availability payment rules (30-100% up front). Page never shows a total. 2026-11-09.

Water/sewer provider:

LinePrinted ratePrototypeReceipt
Water capacity fee
water
$1,375.00
per 350 GPD capacity unit; a single-family dwelling is 350 GPD = 1 unit
$1,375Printed; 1 unit x $1,375.00
Effective 2026-03-10
Source · Metro Water Services Development Fee Schedule (Fee Schedule as of March 10, 2026), Water/Sewer Capacity & Tap Fees (page read visually); flow per Projected Flow Examples (Single Family Dwelling 350 GPD)
fetched 2026-11-09, sha256 72a2ae5d9e72
Sewer capacity fee
sewer
$2,300.00
per 350 GPD capacity unit; a single-family dwelling is 350 GPD = 1 unit
$2,300Printed; 1 unit x $2,300.00
Effective 2026-03-10
Source · Metro Water Services Development Fee Schedule (Fee Schedule as of March 10, 2026), Water/Sewer Capacity & Tap Fees (page read visually); flow per Projected Flow Examples (Single Family Dwelling 350 GPD)
fetched 2026-11-09, sha256 72a2ae5d9e72
Water tap fee, 3/4 inch
water
$525.00
per 3/4 inch tap
$525Printed
Effective 2026-03-10
Source · Metro Water Services Development Fee Schedule (Fee Schedule as of March 10, 2026), Water/Sewer Capacity & Tap Fees (page read visually); flow per Projected Flow Examples (Single Family Dwelling 350 GPD)
fetched 2026-11-09, sha256 72a2ae5d9e72
Sewer tap fee, 6 inch connection
sewer
$360.00
per 6 inch sewer connection
$360Printed
Effective 2026-03-10
Source · Metro Water Services Development Fee Schedule (Fee Schedule as of March 10, 2026), Water/Sewer Capacity & Tap Fees (page read visually); flow per Projected Flow Examples (Single Family Dwelling 350 GPD)
fetched 2026-11-09, sha256 72a2ae5d9e72

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.