Mount Juliet, TN
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. Mt. Juliet TN: Adequate Emergency Service permit fee of .20 cents per sq ft on the entire square footage (Ordinance 2019-34, page read visually and transcribed). Ordinance 98-16 authorizes street and park impact fees but the rates are set by resolution (not found). NOT included: street and park impact fees, building permit (the 2026-32 schedule has no new single-family line), sewer tap ($1,550 on an undated procedures page), water. Page never shows a total. 2026-11-09 second pass.
Water/sewer provider:
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Adequate Emergency Service permit fee, new construction fire · computed | .20 cents per square foot per square foot of the entire square footage of new construction | $480 | .20 x 2,400 sq ft (2,000 heated + 400 garage, entire square footage) = 480.00 Effective 2019-07-09 Source · City of Mt. Juliet Ordinance 2019-34 (passed 7/9/2019) fetched 2026-11-09, sha256 5b5d4f457424 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.