Kingsport, TN

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$5,021listed total
Nonerank by 2025 new single-family permits

Not included: Kingsport TN: water tap 5/8 inch 1,200 and new-account fee 50, sewer tap 2,500 (single-family first unit, inside city), building permit on computed valuation $380,268 (421 + 3.00 x 281) plus $7 technology fee, from Ordinance 7268 and Resolution 2026-272 (FY27, effective July 1 2026). Kingsport posts no impact fees or system development charges. NOT included: per-inspection $3 fee, contractor application $30, electrical/plumbing/mechanical/gas permits, refundable $125 deposit (waived with SSN), Bloomingdale Utility District customers, Sullivan County fees. 2026-11-09 lane B.

Water/sewer provider:

LinePrinted ratePrototypeReceipt
Water tapping fee, 5/8 inch meter
water
$1,200.00
per new meter
$1,200Printed
Effective 2026-07-01
Source · Ordinance No. 7268 (water, sewer and stormwater rates, billing on or after July 1, 2026), D. Tapping Fees
fetched 2026-11-09, sha256 13b793d14cf2
New account set up / start account
water
$50.00
per account
$50Printed
Effective 2026-07-01
Source · Ordinance No. 7268 (water, sewer and stormwater rates, billing on or after July 1, 2026), E. Water Connection Service Fee
fetched 2026-11-09, sha256 13b793d14cf2
Sewer tapping fee, single-family residence, first unit (inside city)
sewer
$2,500.00
per living unit; outside-city low pressure existing structures $6,500
$2,500Printed
Effective 2026-07-01
Source · Ordinance No. 7268 (water, sewer and stormwater rates, billing on or after July 1, 2026), L. Tapping Fees
fetched 2026-11-09, sha256 13b793d14cf2
Building permit
permit · computed
$421.00 for the first $100,000 plus $3.00 per additional $1,000 or fraction (to $500,000)
valuation $380,268 (ICC 175.92 x 2,000 + 71.07 x 400)
$1,264421 + 3.00 x 281 (280.268 rounded up) = 1,264.00
Effective 2026-07-01
Source · Resolution 2026-272 (FY27 fees), E. Building Permit Fees (includes grading permits)
fetched 2026-11-09, sha256 665d43bd0075
Permit technology fee
permit
$7.00
applied to every permit
$7Printed
Effective 2026-07-01
Source · Resolution 2026-272 (FY27 fees), E. Building Permit Fees (includes grading permits)
fetched 2026-11-09, sha256 665d43bd0075
Total listed$5,021

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.