Kingsport, TN
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: Kingsport TN: water tap 5/8 inch 1,200 and new-account fee 50, sewer tap 2,500 (single-family first unit, inside city), building permit on computed valuation $380,268 (421 + 3.00 x 281) plus $7 technology fee, from Ordinance 7268 and Resolution 2026-272 (FY27, effective July 1 2026). Kingsport posts no impact fees or system development charges. NOT included: per-inspection $3 fee, contractor application $30, electrical/plumbing/mechanical/gas permits, refundable $125 deposit (waived with SSN), Bloomingdale Utility District customers, Sullivan County fees. 2026-11-09 lane B.
Water/sewer provider:
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water tapping fee, 5/8 inch meter water | $1,200.00 per new meter | $1,200 | Printed Effective 2026-07-01 Source · Ordinance No. 7268 (water, sewer and stormwater rates, billing on or after July 1, 2026), D. Tapping Fees fetched 2026-11-09, sha256 13b793d14cf2 |
| New account set up / start account water | $50.00 per account | $50 | Printed Effective 2026-07-01 Source · Ordinance No. 7268 (water, sewer and stormwater rates, billing on or after July 1, 2026), E. Water Connection Service Fee fetched 2026-11-09, sha256 13b793d14cf2 |
| Sewer tapping fee, single-family residence, first unit (inside city) sewer | $2,500.00 per living unit; outside-city low pressure existing structures $6,500 | $2,500 | Printed Effective 2026-07-01 Source · Ordinance No. 7268 (water, sewer and stormwater rates, billing on or after July 1, 2026), L. Tapping Fees fetched 2026-11-09, sha256 13b793d14cf2 |
| Building permit permit · computed | $421.00 for the first $100,000 plus $3.00 per additional $1,000 or fraction (to $500,000) valuation $380,268 (ICC 175.92 x 2,000 + 71.07 x 400) | $1,264 | 421 + 3.00 x 281 (280.268 rounded up) = 1,264.00 Effective 2026-07-01 Source · Resolution 2026-272 (FY27 fees), E. Building Permit Fees (includes grading permits) fetched 2026-11-09, sha256 665d43bd0075 |
| Permit technology fee permit | $7.00 applied to every permit | $7 | Printed Effective 2026-07-01 Source · Resolution 2026-272 (FY27 fees), E. Building Permit Fees (includes grading permits) fetched 2026-11-09, sha256 665d43bd0075 |
| Total listed | $5,021 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.