Padstake
Menu

Cookeville, TN

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
Nonerank by 2025 new single-family permits

Impact fees verified. Not a full total. Water and sewer connection charges verified from the City of Cookeville Rates & Fees page: 5/8 x 3/4 inch water connection $2,500 (schedule effective Jan 1, 2013) and sewer connection $2,200 for a single residence where the city installed sewer (inside city limits; outside city limits $2,700 and $4,000; $1,000 where the developer installed sewer; $1,000 sewer capacity fee per new subdivision lot). No impact fee found. NOT included: building permit fee (the city chart says only 'fee varies'; plan review half of permit fee), plumbing permit. Page never shows a total. 2026-11-09.

Water/sewer provider:

LinePrinted ratePrototypeReceipt
Water connection fee, 5/8 x 3/4 inch meter
water
$ 2,500.00
per meter, inside city limits (outside city limits $2,700.00)
$2,500Printed
Effective 2013-01-01
Source · City of Cookeville Water & Sewer Rates & Fees page (rates effective July 1, 2025), Connection Charges, Water Connection Charges (effective January 1, 2013)
fetched 2026-11-09, sha256 bc5d71134d95
Sewer connection fee, single residence, city installed sewer
sewer
$2,200
per single residence, inside city limits (outside $4,000; developer-installed lots $1,000; capacity fee $1,000 per new subdivision lot)
$2,200Printed
Effective 2025-07-01
Source · City of Cookeville Water & Sewer Rates & Fees page (rates effective July 1, 2025), Connection Charges, Sewer Connection Charges
fetched 2026-11-09, sha256 bc5d71134d95

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.