Padstake
Menu

Bedford County Unincorporated Area, TN

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
Nonerank by 2025 new single-family permits

Impact fees verified. Not a full total. Bedford County TN (unincorporated): adequate facilities tax $1.00 per conditioned sq ft x 2,000, building permit from the adopted $85 per sq ft gross value x 2,400 sq ft ($204,000: 506 + 3.30 x 104), seven $35 inspections, mechanical permit $60 and $5 archive fee (county Building Permit Fee Schedule 2023 ver. 3.1, currently adopted; the page says it passed 1.14.20). NOT included: plumbing permit ($5 per trap), septic permit, Bedford County has no county water/sewer, municipal development taxes apply only inside Shelbyville, Wartrace, Bell Buckle and Normandy. Page never shows a total. 2026-11-09 lane B.

Water/sewer provider:

LinePrinted ratePrototypeReceipt
Adequate facilities tax (Bedford County School Facilities Tax)
impact · computed
$1.00 per conditioned square foot of living space
per conditioned sq ft, 2,000 sq ft heated
$2,0001.00 x 2,000 = 2,000.00
Effective n/a
Source · Bedford County Permitting & Impact Fees page
fetched 2026-11-09, sha256 f75a948f5eeb
Building permit (valuation table, $100,001 to $500,000 tier)
permit · computed
$506.00 for the first $100,001.00 plus $3.30 for each additional thousand or fraction thereof
adopted residential value $85.00 per sq ft gross (includes attached garage), 2,400 sq ft = $204,000
$849.20506.00 + 3.30 x 104 = 849.20
Effective n/a
Source · Bedford County Building Permit Fee Schedule 2023 ver. 3.1 (currently adopted), Building Permit Valuation/Cost Table
fetched 2026-11-09, sha256 b45d83b37b4e
Inspection fees, seven listed inspections
permit · computed
$35.00 each (Footing; Foundation; Framing; Insulation; Plumbing; Mechanical; Final)
7 inspections
$24535.00 x 7 = 245.00
Effective n/a
Source · Bedford County Building Permit Fee Schedule 2023 ver. 3.1 (currently adopted), New Construction Permit Fees
fetched 2026-11-09, sha256 b45d83b37b4e
Mechanical permit fee, residential
permit
$60.00
flat
$60Printed
Effective n/a
Source · Bedford County Building Permit Fee Schedule 2023 ver. 3.1 (currently adopted), New Construction Permit Fees
fetched 2026-11-09, sha256 b45d83b37b4e
Archive and records retention fee
permit
$5.00
added to every building permit application
$5Printed
Effective n/a
Source · Bedford County Building Permit Fee Schedule 2023 ver. 3.1 (currently adopted), Building Permit Fees note
fetched 2026-11-09, sha256 b45d83b37b4e

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.