Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
Nonerank by 2025 new single-family permits

Impact fees verified. Not a full total. Simpsonville SC: sewer tap 500, sewer capacity 700 and inspection 25 (residential), building permit on computed valuation $380,268 (510 + 3.75 x 281), plan review $50, and the ground-up construction fee ($100 + 1/2% of project cost) from the adopted FY 2026-27 fee schedule. Simpsonville posts no city impact fee. NOT included: water tap and capacity fees (Greenville Water, separate), electrical/plumbing/mechanical permits (base $25 plus unit charges), $201 public works fee on tax bill, street cut permit $500, Greenville County fees. Page never shows a total. 2026-11-09 lane B.

Water/sewer provider:

LinePrinted ratePrototypeReceipt
Sewer new tap fee, residential
sewer
$500 Residential/$1,000 Commercial
per residential tap
$500Printed (residential)
Effective 2026-07-01
Source · City of Simpsonville Adopted FY 2026-27 Fee Schedule (Appendix A, Annual Budget FY 2026-27), p.59 Sewer Fees
fetched 2026-11-09, sha256 78eeda118b33
Sewer new capacity fee, residential
sewer
$700 Residential/$1,500 Commercial
per residential connection
$700Printed (residential)
Effective 2026-07-01
Source · City of Simpsonville Adopted FY 2026-27 Fee Schedule (Appendix A, Annual Budget FY 2026-27), p.59 Sewer Fees
fetched 2026-11-09, sha256 78eeda118b33
Sewer inspection fee
sewer
$25
per connection
$25Printed
Effective 2026-07-01
Source · City of Simpsonville Adopted FY 2026-27 Fee Schedule (Appendix A, Annual Budget FY 2026-27), p.59 Sewer Fees
fetched 2026-11-09, sha256 78eeda118b33
Building permit, $100,001 to $500,000 tier
permit · computed
$510 for the first $100,000 + $3.75 for each additional thousand or fraction thereof
valuation $380,268 (ICC 175.92 x 2,000 + 71.07 x 400)
$1,563.75510 + 3.75 x 281 (280.268 rounded up) = 1,563.75
Effective 2026-07-01
Source · City of Simpsonville Adopted FY 2026-27 Fee Schedule (Appendix A, Annual Budget FY 2026-27), p.58 Building Permits
fetched 2026-11-09, sha256 78eeda118b33
Residential plan review
permit
$50 Flat Fee
per residential plan
$50Printed
Effective 2026-07-01
Source · City of Simpsonville Adopted FY 2026-27 Fee Schedule (Appendix A, Annual Budget FY 2026-27), p.58 Plan Review
fetched 2026-11-09, sha256 78eeda118b33
Ground-up construction application fee plus administrative fee
permit · computed
$100 application fee plus an administrative fee of 1/2% of total project cost (capped at $10,000)
project cost taken as computed valuation $380,268
$2,001.34100 + 0.005 x 380,268 = 2,001.34
Effective 2026-07-01
Source · City of Simpsonville Adopted FY 2026-27 Fee Schedule (Appendix A, Annual Budget FY 2026-27), p.58 Ground-Up Construction
fetched 2026-11-09, sha256 78eeda118b33

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.