Simpsonville, SC
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. Simpsonville SC: sewer tap 500, sewer capacity 700 and inspection 25 (residential), building permit on computed valuation $380,268 (510 + 3.75 x 281), plan review $50, and the ground-up construction fee ($100 + 1/2% of project cost) from the adopted FY 2026-27 fee schedule. Simpsonville posts no city impact fee. NOT included: water tap and capacity fees (Greenville Water, separate), electrical/plumbing/mechanical permits (base $25 plus unit charges), $201 public works fee on tax bill, street cut permit $500, Greenville County fees. Page never shows a total. 2026-11-09 lane B.
Water/sewer provider:
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Sewer new tap fee, residential sewer | $500 Residential/$1,000 Commercial per residential tap | $500 | Printed (residential) Effective 2026-07-01 Source · City of Simpsonville Adopted FY 2026-27 Fee Schedule (Appendix A, Annual Budget FY 2026-27), p.59 Sewer Fees fetched 2026-11-09, sha256 78eeda118b33 |
| Sewer new capacity fee, residential sewer | $700 Residential/$1,500 Commercial per residential connection | $700 | Printed (residential) Effective 2026-07-01 Source · City of Simpsonville Adopted FY 2026-27 Fee Schedule (Appendix A, Annual Budget FY 2026-27), p.59 Sewer Fees fetched 2026-11-09, sha256 78eeda118b33 |
| Sewer inspection fee sewer | $25 per connection | $25 | Printed Effective 2026-07-01 Source · City of Simpsonville Adopted FY 2026-27 Fee Schedule (Appendix A, Annual Budget FY 2026-27), p.59 Sewer Fees fetched 2026-11-09, sha256 78eeda118b33 |
| Building permit, $100,001 to $500,000 tier permit · computed | $510 for the first $100,000 + $3.75 for each additional thousand or fraction thereof valuation $380,268 (ICC 175.92 x 2,000 + 71.07 x 400) | $1,563.75 | 510 + 3.75 x 281 (280.268 rounded up) = 1,563.75 Effective 2026-07-01 Source · City of Simpsonville Adopted FY 2026-27 Fee Schedule (Appendix A, Annual Budget FY 2026-27), p.58 Building Permits fetched 2026-11-09, sha256 78eeda118b33 |
| Residential plan review permit | $50 Flat Fee per residential plan | $50 | Printed Effective 2026-07-01 Source · City of Simpsonville Adopted FY 2026-27 Fee Schedule (Appendix A, Annual Budget FY 2026-27), p.58 Plan Review fetched 2026-11-09, sha256 78eeda118b33 |
| Ground-up construction application fee plus administrative fee permit · computed | $100 application fee plus an administrative fee of 1/2% of total project cost (capped at $10,000) project cost taken as computed valuation $380,268 | $2,001.34 | 100 + 0.005 x 380,268 = 2,001.34 Effective 2026-07-01 Source · City of Simpsonville Adopted FY 2026-27 Fee Schedule (Appendix A, Annual Budget FY 2026-27), p.58 Ground-Up Construction fetched 2026-11-09, sha256 78eeda118b33 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.