Ridgeland town, SC
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. IMPACT FEES VERIFIED ONLY, no total. Ridgeland SC: water capacity 1,211 and sewer capacity 3,142 (1 REU), water tap 3/4 inch 1,231 (includes the sewer tap), residential construction inspection 40, from Ordinance 10-2026 effective July 1 2026 (image-only PDF, transcribed from the rendered pages, original text kept as .bak-empty). MISSING: building permit, because the town planning fee schedule page contradicts itself (summary table 0.00879 x valuation with 50% plan review; Exhibit A text 0.00659 x valuation with 75% plan review, both effective July 1 2026), so no permit line is shown. NOT included: origination fees 35 each, deposits, new construction inspection 0.10 per sq ft, Jasper County and school fees. 2026-11-09 lane B.
Water/sewer provider:
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water capacity fee, per REU (in-town) water | $1,211.00 in-town | $1,211.00 out-town 1 REU (400 GPD) per house | $1,211 | Printed Effective 2026-07-01 Source · Ridgeland Ordinance 10-2026 Water and Sewer System Schedule of Rates and Fees (effective July 1 2026), Water Capacity Fees fetched 2026-11-09, sha256 cd3312cdf7f6 |
| Sewer capacity fee, per REU (in-town) sewer | $3,142.00 in-town | $3,142.00 out-town 1 REU (300 GPD) per house | $3,142 | Printed Effective 2026-07-01 Source · Ridgeland Ordinance 10-2026 Water and Sewer System Schedule of Rates and Fees (effective July 1 2026), Sewer Capacity Fees fetched 2026-11-09, sha256 cd3312cdf7f6 |
| Water tap fee, 3/4 inch (includes sewer tap fee) water | $1,231.00 3/4 inch meter | $1,231 | Printed Effective 2026-07-01 Source · Ridgeland Ordinance 10-2026 Water and Sewer System Schedule of Rates and Fees (effective July 1 2026), Water Tap Fees (Includes Sewer Tap Fees) fetched 2026-11-09, sha256 cd3312cdf7f6 |
| Residential construction inspection, per REU water | $40.00 1 REU | $40 | Printed Effective 2026-07-01 Source · Ridgeland Ordinance 10-2026 Water and Sewer System Schedule of Rates and Fees (effective July 1 2026), Ancillary Charges, Project Development Fees fetched 2026-11-09, sha256 cd3312cdf7f6 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.