Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
Nonerank by 2025 new single-family permits

Impact fees verified. Not a full total. Greer SC (Greer CPW territory): sewer and water capacity fees and tap fees for a residential 3/4-inch meter from the CPW new construction page (inside city: sewer tap $500, water tap $325; outside city: $650 and $1,125; capacity fees are the same). SC has no road impact fee found. NOT included: City of Greer building permit fees (FY2025-26 Comprehensive Fee Schedule PDF not fetched), $60 residential connection fee, natural gas tap ($255 inside city, $355 outside), electric fees, ReWa/other district charges. Page never shows a total. 2026-11-09 second pass.

Water/sewer provider:

LinePrinted ratePrototypeReceipt
Sewer capacity fee, residential, 3/4 inch
sewer
$5,739
per 3/4 inch meter, same inside and outside city
$5,739Printed
Effective 2026-11-09
Source · Greer CPW New Construction/New Tap Fees (Residential, 3/4 inch meter), 2026 page
fetched 2026-11-09, sha256 4b7956c32035
Water capacity fee, residential, 3/4 inch
water
$1,504
per 3/4 inch meter (per meter), same inside and outside city
$1,504Printed
Effective 2026-11-09
Source · Greer CPW New Construction/New Tap Fees (Residential, 3/4 inch meter), 2026 page
fetched 2026-11-09, sha256 4b7956c32035
Sewer tap fee, residential, 3/4 inch, highest printed (outside city)
sewer · computed
$650 outside city ($500 inside city)
per tap; range $500 inside city to $650 outside city
$650Highest printed of inside city $500 and outside city $650
Effective 2026-11-09
Source · Greer CPW New Construction/New Tap Fees (Residential, 3/4 inch meter), 2026 page
fetched 2026-11-09, sha256 4b7956c32035
Water tap fee, residential, 3/4 inch, highest printed (outside city)
water · computed
$1,125 outside city ($325 inside city)
per tap; range $325 inside city to $1,125 outside city
$1,125Highest printed of inside city $325 and outside city $1,125
Effective 2026-11-09
Source · Greer CPW New Construction/New Tap Fees (Residential, 3/4 inch meter), 2026 page
fetched 2026-11-09, sha256 4b7956c32035

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.