Greer, SC
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. Greer SC (Greer CPW territory): sewer and water capacity fees and tap fees for a residential 3/4-inch meter from the CPW new construction page (inside city: sewer tap $500, water tap $325; outside city: $650 and $1,125; capacity fees are the same). SC has no road impact fee found. NOT included: City of Greer building permit fees (FY2025-26 Comprehensive Fee Schedule PDF not fetched), $60 residential connection fee, natural gas tap ($255 inside city, $355 outside), electric fees, ReWa/other district charges. Page never shows a total. 2026-11-09 second pass.
Water/sewer provider:
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Sewer capacity fee, residential, 3/4 inch sewer | $5,739 per 3/4 inch meter, same inside and outside city | $5,739 | Printed Effective 2026-11-09 Source · Greer CPW New Construction/New Tap Fees (Residential, 3/4 inch meter), 2026 page fetched 2026-11-09, sha256 4b7956c32035 |
| Water capacity fee, residential, 3/4 inch water | $1,504 per 3/4 inch meter (per meter), same inside and outside city | $1,504 | Printed Effective 2026-11-09 Source · Greer CPW New Construction/New Tap Fees (Residential, 3/4 inch meter), 2026 page fetched 2026-11-09, sha256 4b7956c32035 |
| Sewer tap fee, residential, 3/4 inch, highest printed (outside city) sewer · computed | $650 outside city ($500 inside city) per tap; range $500 inside city to $650 outside city | $650 | Highest printed of inside city $500 and outside city $650 Effective 2026-11-09 Source · Greer CPW New Construction/New Tap Fees (Residential, 3/4 inch meter), 2026 page fetched 2026-11-09, sha256 4b7956c32035 |
| Water tap fee, residential, 3/4 inch, highest printed (outside city) water · computed | $1,125 outside city ($325 inside city) per tap; range $325 inside city to $1,125 outside city | $1,125 | Highest printed of inside city $325 and outside city $1,125 Effective 2026-11-09 Source · Greer CPW New Construction/New Tap Fees (Residential, 3/4 inch meter), 2026 page fetched 2026-11-09, sha256 4b7956c32035 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.