Greenville County Unincorporated Area, SC
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. Greenville County SC (parcels in the Greenville Water and ReWa service areas): Greenville Water capacity fee ($2,780), 5/8-inch meter service installation ($1,500) and 3/4-inch tap ($900) effective Jan 1 2026, and the ReWa sewer new account fee for a residential 5/8 or 3/4-inch meter ($5,500 current; $6,947 from Oct 1 2027; the table image was read visually and transcribed). SC has no county road impact fee found. NOT included: county building permit fees (the posted sheet is undated and valuation-based), ReWa retail collection new account fees (phased out Oct 1 2027), service inspection fee, parcels served by other districts (Gantt, Taylors, etc.). Page never shows a total. 2026-11-09 second pass.
Water/sewer provider:
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water capacity fee, 5/8 inch meter water | $2,780 per 5/8 inch meter (updated fee; unit-size schedule: 2-bedroom over 1,200 sq ft and standard $2,780) | $2,780 | Printed Effective 2026-01-01 Source · Greenville Water Updated Development Fees and Charges, Effective January 1, 2026, Update to Capacity Fees fetched 2026-11-09, sha256 be5823ada616 |
| 5/8 inch meter service installation (includes meter set fee) water | $1,500.00 per 5/8 inch meter service | $1,500 | Printed Effective 2026-01-01 Source · Greenville Water Updated Development Fees and Charges, Effective January 1, 2026, New Development Fees and Charges fetched 2026-11-09, sha256 be5823ada616 |
| Connection fee (tap or tee), 5/8 inch meter with 3/4 inch tap water | $900 per 3/4 inch tap | $900 | Printed Effective 2026-01-01 Source · Greenville Water Updated Development Fees and Charges, Effective January 1, 2026, Connection Fee fetched 2026-11-09, sha256 be5823ada616 |
| Sewer new account fee (NAF), residential 5/8 inch or 3/4 inch meter sewer | $5,500 per residential 5/8 inch or 3/4 inch meter, Current (Oct. 1, 2027: $6,947) | $5,500 | Printed Effective 2026-11-09 Source · ReWa New Account Fees (NAF), Residential 5/8 inch and 3/4 inch, Current column fetched 2026-11-09, sha256 2f53a32e0924 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.