Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
Nonerank by 2025 new single-family permits

Impact fees verified. Not a full total. Impact fees verified plus permit fees. Included: Tualatin water SDC (3/4-inch meter), sewer SDC (Clean Water Services regional + local), stormwater SDC (one ESU assumed), parks SDC (rate sheet effective 2/1/2025, latest posted), 3/4-inch meter installation deposit, structural permit with plan review, state surcharge, technology, energy incentive fees and Metro CET on computed $380,268 valuation. Missing: Washington County Transportation Development Tax (amount not posted by the city), water service line installation (actual cost deposit), fire and life safety plan review (45% when required), school construction excise tax (district-set, see city PDF), electrical permit. Searched 2026-11-09.

Water/sewer provider: City of Tualatin (water, sewer, stormwater)

LinePrinted ratePrototypeReceipt
Water SDC, 3/4-inch meter (effective Feb 1 2026; adjusts each Feb 1 by ENR CCI Seattle)
water
8,632
per 3/4" meter
$8,632Printed
Effective 2026-07-01
Source · City of Tualatin Resolution No. 5964-26, p.1
fetched 2026-11-09, sha256 bba10aa2c4eb
Sewer SDC per EDU, total (regional $7,040.00 + local $292.00), as of July 1 2026
sewer
$7,332.00
per EDU
$7,332Printed total
Effective 2026-07-01
Source · City of Tualatin Resolution No. 5964-26, p.2
fetched 2026-11-09, sha256 bba10aa2c4eb
Stormwater SDC per equivalent service unit, as of July 1 2026
stormwater
$710.00
per ESU
$710One ESU assumed for a single-family lot
Effective 2026-07-01
Source · City of Tualatin Resolution No. 5964-26, p.2
fetched 2026-11-09, sha256 bba10aa2c4eb
Water meter installation deposit, 3/4-inch drop-in meter
tap
200
deposit
$200Printed as deposit; actual cost settles at installation
Effective 2026-07-01
Source · City of Tualatin Resolution No. 5964-26, p.2
fetched 2026-11-09, sha256 bba10aa2c4eb
Parks SDC, single family detached, rates effective 2/1/2025 (latest rate sheet posted)
parks
$9,656
per dwelling unit
$9,656Printed
Effective 2026-07-01
Source · City of Tualatin Parks SDC Rate Schedule effective 2/1/2025
fetched 2026-11-09, sha256 ab6e15e4e4fd
Building permit (structural incl. mechanical and plumbing), over $100,000 tier, valuation $380,268
permit · computed
$987.15 base + $5.00 per additional $1,000 or fraction
valuation
$2,392.15$987.15 + 281 x $5.00 = $2,392.15 on computed valuation $380,268 (ICC BVD R-3 V-B 175.92 x 2,000 + U V-B 71.07 x 400)
Effective 2026-07-01
Source · Tualatin Building Division Fee Schedule effective November 1 2026 p.1
fetched 2026-11-09, sha256 625d8fb6216f
Plan review fee, 70% of permit fee
permit · computed
70 percent
of permit fee
$1,674.510.70 x $2,392.15 = $1,674.51
Effective 2026-07-01
Source · Tualatin Fees & System Development Charges page
fetched 2026-11-09, sha256 1c23e7287404
Oregon state surcharge, 12% of permit fee
permit · computed
12 percent
of permit fee
$287.060.12 x $2,392.15 = $287.06
Effective 2026-07-01
Source · Tualatin Fees & System Development Charges page
fetched 2026-11-09, sha256 1c23e7287404
Technology fee, 5% of permit fee
permit · computed
5 percent
of permit fee
$119.610.05 x $2,392.15 = $119.61
Effective 2026-07-01
Source · Tualatin Fees & System Development Charges page
fetched 2026-11-09, sha256 1c23e7287404
Energy efficiency incentive fee, 5% of permit fee
permit · computed
5 percent
of permit fee
$119.610.05 x $2,392.15 = $119.61
Effective 2026-07-01
Source · Tualatin Fees & System Development Charges page
fetched 2026-11-09, sha256 1c23e7287404
Metro construction excise tax, 0.12% of valuation over $100,000 (max $12,000)
tax · computed
0.12%
of valuation
$456.320.0012 x $380,268 = $456.32
Effective 2026-07-01
Source · Tualatin Fees & System Development Charges page
fetched 2026-11-09, sha256 1c23e7287404

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.