Tualatin, OR
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. Impact fees verified plus permit fees. Included: Tualatin water SDC (3/4-inch meter), sewer SDC (Clean Water Services regional + local), stormwater SDC (one ESU assumed), parks SDC (rate sheet effective 2/1/2025, latest posted), 3/4-inch meter installation deposit, structural permit with plan review, state surcharge, technology, energy incentive fees and Metro CET on computed $380,268 valuation. Missing: Washington County Transportation Development Tax (amount not posted by the city), water service line installation (actual cost deposit), fire and life safety plan review (45% when required), school construction excise tax (district-set, see city PDF), electrical permit. Searched 2026-11-09.
Water/sewer provider: City of Tualatin (water, sewer, stormwater)
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water SDC, 3/4-inch meter (effective Feb 1 2026; adjusts each Feb 1 by ENR CCI Seattle) water | 8,632 per 3/4" meter | $8,632 | Printed Effective 2026-07-01 Source · City of Tualatin Resolution No. 5964-26, p.1 fetched 2026-11-09, sha256 bba10aa2c4eb |
| Sewer SDC per EDU, total (regional $7,040.00 + local $292.00), as of July 1 2026 sewer | $7,332.00 per EDU | $7,332 | Printed total Effective 2026-07-01 Source · City of Tualatin Resolution No. 5964-26, p.2 fetched 2026-11-09, sha256 bba10aa2c4eb |
| Stormwater SDC per equivalent service unit, as of July 1 2026 stormwater | $710.00 per ESU | $710 | One ESU assumed for a single-family lot Effective 2026-07-01 Source · City of Tualatin Resolution No. 5964-26, p.2 fetched 2026-11-09, sha256 bba10aa2c4eb |
| Water meter installation deposit, 3/4-inch drop-in meter tap | 200 deposit | $200 | Printed as deposit; actual cost settles at installation Effective 2026-07-01 Source · City of Tualatin Resolution No. 5964-26, p.2 fetched 2026-11-09, sha256 bba10aa2c4eb |
| Parks SDC, single family detached, rates effective 2/1/2025 (latest rate sheet posted) parks | $9,656 per dwelling unit | $9,656 | Printed Effective 2026-07-01 Source · City of Tualatin Parks SDC Rate Schedule effective 2/1/2025 fetched 2026-11-09, sha256 ab6e15e4e4fd |
| Building permit (structural incl. mechanical and plumbing), over $100,000 tier, valuation $380,268 permit · computed | $987.15 base + $5.00 per additional $1,000 or fraction valuation | $2,392.15 | $987.15 + 281 x $5.00 = $2,392.15 on computed valuation $380,268 (ICC BVD R-3 V-B 175.92 x 2,000 + U V-B 71.07 x 400) Effective 2026-07-01 Source · Tualatin Building Division Fee Schedule effective November 1 2026 p.1 fetched 2026-11-09, sha256 625d8fb6216f |
| Plan review fee, 70% of permit fee permit · computed | 70 percent of permit fee | $1,674.51 | 0.70 x $2,392.15 = $1,674.51 Effective 2026-07-01 Source · Tualatin Fees & System Development Charges page fetched 2026-11-09, sha256 1c23e7287404 |
| Oregon state surcharge, 12% of permit fee permit · computed | 12 percent of permit fee | $287.06 | 0.12 x $2,392.15 = $287.06 Effective 2026-07-01 Source · Tualatin Fees & System Development Charges page fetched 2026-11-09, sha256 1c23e7287404 |
| Technology fee, 5% of permit fee permit · computed | 5 percent of permit fee | $119.61 | 0.05 x $2,392.15 = $119.61 Effective 2026-07-01 Source · Tualatin Fees & System Development Charges page fetched 2026-11-09, sha256 1c23e7287404 |
| Energy efficiency incentive fee, 5% of permit fee permit · computed | 5 percent of permit fee | $119.61 | 0.05 x $2,392.15 = $119.61 Effective 2026-07-01 Source · Tualatin Fees & System Development Charges page fetched 2026-11-09, sha256 1c23e7287404 |
| Metro construction excise tax, 0.12% of valuation over $100,000 (max $12,000) tax · computed | 0.12% of valuation | $456.32 | 0.0012 x $380,268 = $456.32 Effective 2026-07-01 Source · Tualatin Fees & System Development Charges page fetched 2026-11-09, sha256 1c23e7287404 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.