Padstake
Menu

Portland, OR

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
Nonerank by 2025 new single-family permits

Impact fees verified. Not a full total. Impact fees verified only, transportation and parks SDCs. Included: Portland TSDC for a single family home of 1,200 sq ft or more and Parks SDC for a 1,700-2,199 sq ft unit (Non-Central City, highest printed sub-area), effective July 1 2026. Missing: Environmental Services sanitary and stormwater SDCs (sanitary SDC is computed from drainage fixture units, not read), Water Bureau SDC (fee schedule PDF not read), building permit fees. Permits for newly created housing units issued Aug 15 2025 through Sept 30 2028 may be exempt from SDCs under conditions (Portland temporary exemption), so the SDCs shown may not apply. Searched 2026-11-09.

Water/sewer provider: City of Portland (SDCs: transportation, parks)

LinePrinted ratePrototypeReceipt
Transportation System Development Charge (TSDC), single family 1,200 square feet or more (rates effective July 1, 2026 - June 30, 2027)
transport
$6,841.00
per dwelling
$6,841Printed (single family 1,199 sq ft or less $3,421.00)
Effective 2026-07-01
Source · Portland Bureau of Transportation TSDC Rates (Citywide) July 1, 2026 - June 30, 2027
fetched 2026-11-09, sha256 62c944cb208b
Parks SDC, Non-Central City, residential 1,700 - 2,199 square feet (fees 7/1/2026 - 6/30/2027; Central City $12,983)
parks · computed
$16,420
per unit by size
$16,420Highest printed sub-area (Non-Central City) shown; second column is 7/1/2026-6/30/2027; Central City $12,983
Effective 2026-07-01
Source · Portland Parks and Recreation FY26/27 SDC Schedule, Residential Park SDC Fee
fetched 2026-11-09, sha256 401b5e175fea

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.