Medford, OR
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: Included: valuation permit with 65% plan review and the single-family planning surcharge (city fee schedule 7/1/2026), street, regional sewer treatment, city sewer collection, storm drain and parks SDCs (city sheets effective 7/1/2026; parks at the highest printed area), and the Medford Water Commission system-wide SDC for a 5/8 x 3/4-inch meter (effective 9/1/2026). Not included: East Side High Level water SDC $16,135.98 per gross acre and Southwest High Level $10,886.24 per gross acre (zone and acreage dependent), Medford Water service connection and meter fees (Exhibit D of its regulations, not read), fire life safety plan review (40%, likely commercial), Rogue Valley Sewer Services fees if RVSS serves the parcel, state building surcharges, private development per-lot admin fee ($579-$1,010 per lot, developers). Searched 2026-11-09.
Water/sewer provider: City of Medford (sewer); Medford Water Commission (water)
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Building permit (valuation-based) permit · computed | $749.28 for the first $100,000 AND $4.03 for each additional $1,000 or fraction thereof percent of valuation | $1,881.71 | Valuation $380,268 (ICC BVD R-3 V-B 175.92 x 2,000 + U V-B 71.07 x 400); 281 additional $1,000 units x 4.03 + 749.28 = 1,881.71. City valuation is "as determined by MMC 9.270(3)", not read Effective 2026-07-01 Source · City of Medford Fees and Charges 2026, effective July 1, 2026, Building Permits fetched 2026-11-09, sha256 789e3fac7b3d |
| Plan review permit · computed | 65% percent of building permit fee | $1,223.11 | 65% x 1,881.71 = 1,223.11 Effective 2026-07-01 Source · City of Medford Fees and Charges 2026, effective July 1, 2026, Plan Review fetched 2026-11-09, sha256 789e3fac7b3d |
| Single family building permit surcharge (planning) permit | $450.00 flat, not subject to annual increases | $450 | Printed Effective 2026-07-01 Source · City of Medford Fees and Charges 2026, effective July 1, 2026, Planning fetched 2026-11-09, sha256 789e3fac7b3d |
| Street SDC, single-family residence (ITE 210) transportation | $4,853.89 per dwelling | $4,853.89 | Printed Effective 2026-07-01 Source · City of Medford Residential SDCs effective July 1, 2026 fetched 2026-11-09, sha256 f5667178c1d7 |
| Regional sanitary sewer treatment SDC, single-family sewer | $2,014.78 per dwelling | $2,014.78 | Printed Effective 2026-07-01 Source · City of Medford Residential SDCs effective July 1, 2026 fetched 2026-11-09, sha256 f5667178c1d7 |
| City of Medford sanitary sewer collection SDC, single-family sewer | $1,971.28 per dwelling | $1,971.28 | Printed (city collection; Rogue Valley Sewer Services areas pay RVSS fees instead) Effective 2026-07-01 Source · City of Medford Residential SDCs effective July 1, 2026 fetched 2026-11-09, sha256 f5667178c1d7 |
| Storm drain SDC, single-family residence stormwater | $587.20 per ERU (3,730 sq ft impervious) | $587.20 | Printed; one SFR per lot, determined at permit review Effective 2026-07-01 Source · City of Medford Residential SDCs effective July 1, 2026 fetched 2026-11-09, sha256 f5667178c1d7 |
| Parks SDC, single family dwelling unit (Southeast Plan Area) parks | $6,662.00 per dwelling unit | $6,662 | Printed; highest printed area; $4,661.00 outside the Southeast Plan Area Effective 2026-07-01 Source · City of Medford Fees and Charges 2026, effective July 1, 2026, Parks Systems Development Charge fetched 2026-11-09, sha256 789e3fac7b3d |
| Medford Water system-wide SDC, 5/8 x 3/4-inch meter water | $2,537.50 per meter, effective Sept 1, 2026 | $2,537.50 | Printed Effective 2026-07-01 Source · Medford Water Commission Development Fees/SDCs page fetched 2026-11-09, sha256 421c191bbee5 |
| Total listed | $22,181.47 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.