Padstake
Menu

Happy Valley, OR

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
Nonerank by 2025 new single-family permits

Impact fees verified. Not a full total. Impact fees verified. Included: Happy Valley transportation, parks and city storm SDCs; Clackamas WES surface water and sanitary sewer SDCs (sewer printed for a 2,500 sq ft residence); Sunrise Water Authority water meter SDC; Metro CET and school CET. The city page prints these rates as effective December 3, 2026 to June 30, 2027 (the prior schedule effective 7/1/2025 printed transportation $12,779 and parks $10,479); the page was read 2026-11-09, so the rates may not yet be in force. Missing: building permit fees (city page only gives an average of $7,759 for a 2,500 sq ft home with garage, not a posted schedule row), water service in limited areas by Clackamas River Water instead of Sunrise. Searched 2026-11-09.

Water/sewer provider: City of Happy Valley (SDCs; WES sewer; Sunrise Water)

LinePrinted ratePrototypeReceipt
Transportation SDC, single family detached
transport
$14,057
per dwelling
$14,057Printed
Effective 2026-12-03
Source · City of Happy Valley SDCs & Excise Taxes page (rates effective December 3, 2026 - June 30, 2027), Current SDC Charges
fetched 2026-11-09, sha256 fadf9de0f437
Parks SDC, single family detached
parks
$11,527
per dwelling
$11,527Printed
Effective 2026-12-03
Source · City of Happy Valley SDCs & Excise Taxes page (rates effective December 3, 2026 - June 30, 2027), Current SDC Charges
fetched 2026-11-09, sha256 fadf9de0f437
City storm drainage SDC, single family detached
stormwater
$216
per dwelling
$216Printed
Effective 2026-12-03
Source · City of Happy Valley SDCs & Excise Taxes page (rates effective December 3, 2026 - June 30, 2027), Current SDC Charges
fetched 2026-11-09, sha256 fadf9de0f437
Surface water SDC (Clackamas County Water Environment Services), single family detached
stormwater
$272
per dwelling
$272Printed
Effective 2026-12-03
Source · City of Happy Valley SDCs & Excise Taxes page (rates effective December 3, 2026 - June 30, 2027), Current SDC Charges
fetched 2026-11-09, sha256 fadf9de0f437
Sanitary sewer SDC (Water Environment Services), based on 2,500 square-foot residence
sewer
$9,630
per residence
$9,630Printed for a 2,500 sq ft residence
Effective 2026-12-03
Source · City of Happy Valley SDCs & Excise Taxes page (rates effective December 3, 2026 - June 30, 2027), Current SDC Charges
fetched 2026-11-09, sha256 fadf9de0f437
Water meter SDC (Sunrise Water Authority)
water
$16,532
per single family home
$16,532Printed
Effective 2026-12-03
Source · City of Happy Valley SDCs & Excise Taxes page (rates effective December 3, 2026 - June 30, 2027), Current SDC Charges
fetched 2026-11-09, sha256 fadf9de0f437
Metro construction excise tax, $0.0012 of value of improvements (projects over $100,000)
tax · computed
$0.0012
of valuation
$456.320.0012 x $380,268 = $456.32 on computed valuation $380,268 (ICC BVD R-3 V-B 175.92 x 2,000 + U V-B 71.07 x 400)
Effective 2026-12-03
Source · City of Happy Valley SDCs & Excise Taxes page (rates effective December 3, 2026 - June 30, 2027), Construction Excise Taxes
fetched 2026-11-09, sha256 fadf9de0f437
School district construction excise tax, $1.70 per square foot residential (NCSD#12 and Centennial) x 2,000 sq ft
tax · computed
$1.70
per sq ft
$3,4001.70 x 2,000 = $3,400
Effective 2026-12-03
Source · City of Happy Valley SDCs & Excise Taxes page (rates effective December 3, 2026 - June 30, 2027), Construction Excise Taxes
fetched 2026-11-09, sha256 fadf9de0f437

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.