Stillwater, OK

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$1,641.83listed total
Nonerank by 2025 new single-family permits

Not included: Included: 3/4-inch water capacity, meter/fittings and tie-on fees and sewer capacity fee (Water Meter Fee Information Sheet, revised 10/2026), residential transportation fee on a 7,000 sq ft lot (assumed), residential building permit, electrical service (200-amp assumed), plumbing and mechanical base permits (2026 Building Permit Fee Schedule, effective 07/01/2026). Not included: water closet fee $100 per toilet/urinal (count not known), extra bathrooms ($18.63 each), extra air handlers, temporary and fixture-stocking fees, utility deposits, road bore. Square footage assumed 2,000 heated. Searched 2026-11-09 (lane A).

Water/sewer provider: City of Stillwater

LinePrinted ratePrototypeReceipt
Water capacity fee, 3/4-inch meter, inside city limits
water
$150.00
per meter, by size
$150Printed
Effective 2026-10-01
Source · Water Meter Fee Information Sheet (rev 10/2026)
fetched 2026-11-09, sha256 6b22355798a4
Water meter and fittings charge, 3/4-inch
water
$127.00
per meter
$127Printed
Effective 2026-10-01
Source · Water Meter Fee Information Sheet
fetched 2026-11-09, sha256 6b22355798a4
Water meter tie-on fee, 3/4-inch
water
$100.00
per meter
$100Printed
Effective 2026-10-01
Source · Water Meter Fee Information Sheet
fetched 2026-11-09, sha256 6b22355798a4
Sewer capacity fee, 3/4-inch meter, inside city limits
sewer
$400.00
per meter, by size
$400Printed
Effective 2026-10-01
Source · Sewer Connection Fees, Water Meter Fee Information Sheet
fetched 2026-11-09, sha256 6b22355798a4
Residential transportation fee
transportation · computed
$0.075/sq ft of lot area ($750.00 Maximum)
per sq ft of lot
$5250.075 x 7,000 sq ft lot (assumed) = 525.00, under the 750 maximum
Effective 2026-07-01
Source · Building Permit and Impact Fees (eff. 07/01/2026), New Single and Duplex Family Structure
fetched 2026-11-09, sha256 9f9fbb434038
New residential building permit (1 and 2 family)
permit · computed
$37.31/dwelling unit + $0.038/sf ($37.82 Min)
per dwelling plus per sq ft
$113.3137.31 + 0.038 x 2,000 sq ft heated = 113.31
Effective 2026-07-01
Source · 2026 Building Permit Fee Schedule, page 2
fetched 2026-11-09, sha256 9f9fbb434038
Electrical, new construction service (200-amp service assumed)
permit · computed
$56.63 for each 100 amps or any amp fraction thereof
per 100 amps
$113.2656.63 x 2 (200 amps, assumed) = 113.26
Effective 2026-07-01
Source · Electrical Permit Fees, page 3
fetched 2026-11-09, sha256 9f9fbb434038
Plumbing, new residential single family (one bathroom base)
permit · computed
$56.63 + $18.63 per bathroom over one
base plus per bathroom
$56.63Base 56.63; extra bathrooms not added
Effective 2026-07-01
Source · Plumbing Permit Fees, page 4
fetched 2026-11-09, sha256 9f9fbb434038
Mechanical, new construction (one air handler base)
permit · computed
$56.63 + $18.63 for each air handler over one
base plus per air handler
$56.63Base 56.63; extra air handlers not added
Effective 2026-07-01
Source · Mechanical Permit Fees, page 4
fetched 2026-11-09, sha256 9f9fbb434038
Total listed$1,641.83

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.