Skiatook, OK
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: Included: building permit for a 2,000-2,099 sq ft building $520 (base $270 + surcharge $250 per the city table; area basis not defined, 2,000 assumed), sewer tap permit added to the building permit $150 inside city limits, sewer tap $500 and 3/4-inch water tap $1,100 (City of Skiatook City Hall Fee Schedule effective Jan 1 2025). The source is a Word document stored as .html; its text was extracted into the stored .txt (original kept as .bak-binary). No impact fee is posted. Not included: sewer development fee $1,000 per acre (not per house), water meter and deposit, trade permits, Oklahoma state permit fee. Searched 2026-11-09 (lane A).
Water/sewer provider: City of Skiatook
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Building permit, new building 2,000-2,099 sq ft (base fee $270 + surcharge $250) permit · computed | Total fee $520.00 for 2,000-2,099 sq ft; +$13 per 100 sq ft above 2,000 sq ft | $520 | Printed table row 2000-2099: base 270.00 + surcharge 250.00 = 520.00 (assumed 2,000 sq ft) Effective 2025-01-01 Source · City of Skiatook City Hall Fee Schedule (effective Jan 1, 2025, revised 2-11-25), Building Permits fetched 2026-11-09, sha256 359d4934e223 |
| Sewer tap permit, inside city limits (added to building permit) sewer | $150.00 inside city limits ($250.00 outside) per tap | $150 | Printed inside-city amount Effective 2025-01-01 Source · City of Skiatook City Hall Fee Schedule (effective Jan 1, 2025, revised 2-11-25), Building Permits note fetched 2026-11-09, sha256 359d4934e223 |
| Sewer tap sewer | $500.00 per tap | $500 | Printed Effective 2025-01-01 Source · City of Skiatook City Hall Fee Schedule (effective Jan 1, 2025, revised 2-11-25), Utility Fees fetched 2026-11-09, sha256 359d4934e223 |
| 3/4-inch water tap water | $1,100.00 per tap | $1,100 | Printed Effective 2025-01-01 Source · City of Skiatook City Hall Fee Schedule (effective Jan 1, 2025, revised 2-11-25), Utility Fees fetched 2026-11-09, sha256 359d4934e223 |
| Total listed | $2,270 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.